PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 is Malaysia P.U. (A), cited as P.U. (A) 307 2015, currently marked in force and first recorded in 2015.
Opening note
Preamble
- PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa
(1)
Perintah ini bolehlah dinamakan Perintah Tenaga Boleh Baharu
(Pindaan Jadual) (No. 2) 2015.
Seksyen 2
Jadual kepada Akta Tenaga Boleh Baharu 2011 dipinda—
(a)
dengan menggantikan butiran “Hidrokuasa kecil” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut:
Ruang
Pertama
Ruang
Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
“Hidrokuasa kecil
(a)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti
Kadar tarif galakan asas
Seksyen 0
26 21 tahun 0%
P.U. (A) 307 3
Ruang
Pertama
Ruang
Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan terpasang sehingga dan termasuk 2 megawatt
(b)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang melebihi 2 megawatt, dan sehingga dan termasuk 10 megawatt 0.25 21 tahun 0%
(c)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt 0.24 21 tahun 0%”; dan
P.U. (A) 307 4
(b)
dengan menggantikan butiran “Fotovolta suria” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut:
Ruang
Pertama
Ruang
Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
“Fotovolta suria
(a)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang—
Kadar tarif galakan asas
Seksyen 0
8249
21 tahun 10%
Seksyen 0
8048
21 tahun 10%
Seksyen 0
8249
21 tahun 10%
P.U. (A) 307 5
Ruang
Pertama
Ruang
Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
Seksyen 0
8048
21 tahun 10%
Seksyen 0
6139
21 tahun 15%
Seksyen 0
5930
21 tahun 15%
P.U. (A) 307 6
Ruang
Pertama
Ruang
Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
Seksyen 0
4651
21 tahun 15%
Seksyen 0
4162
21 tahun 15%
(b)
Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan
Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas
P.U. (A) 307 7
Ruang
Pertama
Ruang
Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan kepada (a)
di atas—
(i)
penggunaan sebagai pepasangan dalam bangunan atau struktur bangunan
+ 0.1550
21 tahun 10%
(iii)
penggunaan modul fotovolta suria yang dibuat atau dipasang di Malaysia
+ 0.05 21 tahun 0%
(iv)
penggunaan alat penyongsang suria yang dibuat atau dipasang di
Malaysia
+ 0.05 21 tahun 0%”.
P.U. (A) 307 8
Dibuat 28 Disember 2015
[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Menteri Tenaga, Teknologi Hijau dan Air
P.U. (A) 307 9
RENEWABLE ENERGY ACT 2011
RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) (NO. 2) ORDER 2015
Opening note
Preamble
- IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.
(1)
This order may be cited as the
Renewable
Energy
(Amendment of Schedule) (No. 2) Order 2015.
(2)
This Order comes into operation on 1 January 2016.
Amendment of Schedule 2.
The Schedule to the Renewable Energy Act 2011 is amended—
(a)
by substituting for the item “Small hydropower” and other items relating to it the following items:
First
Column
Second
Column
Third
Column
Fourth
Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
“Small hydropower
(a)
Renewable energy installation having an installed capacity of up to and including 2 megawatts
Basic feed-in tariff
Seksyen 0
26 21 years 0%
P.U. (A) 307 10
First
Column
Second
Column
Third
Column
Fourth
Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
(b)
Renewable energy installation having an installed capacity above 2 megawatts, and up to and including 10 megawatts
Seksyen 0
25 21 years 0%
(c)
Renewable energy installation having an installed capacity above 10 megawatts, and up to and including 30 megawatts
Seksyen 0
24 21 years 0%”; and
P.U. (A) 307 11
(b)
by substituting for the item “Solar photovoltaic” and other items relating to it the following items:
First
Column
Second
Column
Third
Column
Fourth
Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
“Solar photovoltaic
(a)
Renewable energy installation having an installed capacity of—
Basic feed-in tariff
Seksyen 0
8249
21 years 10%
Seksyen 0
8048
21 years 10%
Seksyen 0
8249
21 years 10%
Seksyen 0
8048
21 years 10%
Seksyen 0
6139
21 years 15%
P.U. (A) 307 12
First
Column
Second
Column
Third
Column
Fourth
Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate individual)
Seksyen 0
5930
21 years 15%
Seksyen 0
4651
21 years 15%
Seksyen 0
4162
21 years 15%
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a) above—
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
(i)
use as installation in building or building structures
+ 0.1550
21 years 10%
P.U. (A) 307 13
First
Column
Second
Column
Third
Column
Fourth
Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
(iii)
use of solar photovoltaic modules manufactured or assembled in Malaysia
+ 0.05 21 years 0%
(iv)
use of solar inverters manufactured or assembled in Malaysia
+ 0.05 21 years 0%”.
Made 28 December 2015
[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Minister of Energy, Green Technology and Water
Common questions
- What is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015?
- PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 is Malaysia P.U. (A), cited as P.U. (A) 307 2015, currently marked in force and first recorded in 2015.
- Is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 still in force?
- Yes — PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 is currently in force.
- When did PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 take effect?
- PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 was first recorded in 2015.
- How many sections does PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 have?
- PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 contains 22 sections.
- Where can I read the official version of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015?
- The official text of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 is published at lom.agc.gov.my.