/akn/my/act/pua/2015/307

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2015
Sections
22

Quick answer

About this p.u. (a)

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 is Malaysia P.U. (A), cited as P.U. (A) 307 2015, currently marked in force and first recorded in 2015.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

(1)

Perintah ini bolehlah dinamakan Perintah Tenaga Boleh Baharu

(Pindaan Jadual) (No. 2) 2015.

Suggest a correction

(2)

Perintah ini mula berkuat kuasa pada 1 Januari 2016.

Pindaan Jadual

Suggest a correction

(a)

dengan menggantikan butiran “Hidrokuasa kecil” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut:

Ruang

Pertama

Ruang

Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

“Hidrokuasa kecil

Suggest a correction

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti

Kadar tarif galakan asas

Suggest a correction

Seksyen 0

Open as pageSuggest a correction

26 21 tahun 0%

P.U. (A) 307 3

Ruang

Pertama

Ruang

Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan terpasang sehingga dan termasuk 2 megawatt

(b)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang melebihi 2 megawatt, dan sehingga dan termasuk 10 megawatt 0.25 21 tahun 0%

Suggest a correction

(c)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang melebihi 10 megawatt, dan sehingga dan termasuk 30 megawatt 0.24 21 tahun 0%”; dan

P.U. (A) 307 4

Suggest a correction

(b)

dengan menggantikan butiran “Fotovolta suria” dan butiran lain yang berhubungan dengannya dengan butiran yang berikut:

Ruang

Pertama

Ruang

Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

“Fotovolta suria

Suggest a correction

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang—

Kadar tarif galakan asas

Suggest a correction

(ii)

melebihi 4 kilowatt, dan sehingga dan termasuk 12 kilowatt

(individu)

Suggest a correction

(iii)

sehingga dan termasuk 4 kilowatt

(bukan individu)

Suggest a correction

Seksyen 0

Suggest a correction

8249

21 tahun 10%

P.U. (A) 307 5

Ruang

Pertama

Ruang

Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

(iv)

melebihi 4 kilowatt, dan sehingga dan termasuk 24 kilowatt

(bukan individu)

Suggest a correction

(v)

melebihi 24 kilowatt, dan sehingga dan termasuk 72 kilowatt

(bukan individu)

Suggest a correction

(vi)

melebihi 72 kilowatt, dan sehingga dan termasuk 1 megawatt

(bukan individu)

Suggest a correction

Seksyen 0

Suggest a correction

5930

21 tahun 15%

P.U. (A) 307 6

Ruang

Pertama

Ruang

Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

(vii)

melebihi 1 megawatt, dan sehingga dan termasuk 10

megawatt

(bukan individu)

Suggest a correction

(viii)

melebihi 10

megawatt, dan sehingga dan termasuk 30

megawatt

(bukan individu

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

P.U. (A) 307 7

Ruang

Pertama

Ruang

Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan kepada (a)

di atas—

Suggest a correction

(i)

penggunaan sebagai pepasangan dalam bangunan atau struktur bangunan

+ 0.1550

21 tahun 10%

Suggest a correction

(ii)

penggunaan sebagai bahan bangunan

+ 0.1325

21 tahun 20%

Suggest a correction

(iii)

penggunaan modul fotovolta suria yang dibuat atau dipasang di Malaysia

+ 0.05 21 tahun 0%

Suggest a correction

(iv)

penggunaan alat penyongsang suria yang dibuat atau dipasang di

Malaysia

+ 0.05 21 tahun 0%”.

P.U. (A) 307 8

Dibuat 28 Disember 2015

[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Menteri Tenaga, Teknologi Hijau dan Air

P.U. (A) 307 9

RENEWABLE ENERGY ACT 2011

RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) (NO. 2) ORDER 2015

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the

Renewable

Energy

(Amendment of Schedule) (No. 2) Order 2015.

Suggest a correction

(2)

This Order comes into operation on 1 January 2016.

Amendment of Schedule 2.

The Schedule to the Renewable Energy Act 2011 is amended—

Suggest a correction

(a)

by substituting for the item “Small hydropower” and other items relating to it the following items:

First

Column

Second

Column

Third

Column

Fourth

Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

“Small hydropower

Suggest a correction

(a)

Renewable energy installation having an installed capacity of up to and including 2 megawatts

Basic feed-in tariff

Suggest a correction

Seksyen 0

Suggest a correction

26 21 years 0%

P.U. (A) 307 10

First

Column

Second

Column

Third

Column

Fourth

Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

(b)

Renewable energy installation having an installed capacity above 2 megawatts, and up to and including 10 megawatts

Suggest a correction

(c)

Renewable energy installation having an installed capacity above 10 megawatts, and up to and including 30 megawatts

Suggest a correction

(b)

by substituting for the item “Solar photovoltaic” and other items relating to it the following items:

First

Column

Second

Column

Third

Column

Fourth

Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

“Solar photovoltaic

Suggest a correction

(a)

Renewable energy installation having an installed capacity of—

Basic feed-in tariff

Suggest a correction

(ii)

above 4

kilowatts, and up to and including 12

kilowatts

(individual)

Suggest a correction

(iii)

up to and including 4

kilowatts

(non-individual)

Suggest a correction

(iv)

above 4

kilowatts, and up to and including 24

kilowatts

(non-individual)

Suggest a correction

(v)

above 24

kilowatts, and up to and including 72

kilowatts

(non-

Suggest a correction

Seksyen 0

Suggest a correction

6139

21 years 15%

P.U. (A) 307 12

First

Column

Second

Column

Third

Column

Fourth

Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate individual)

(vi)

above 72

kilowatts, and up to and including 1

megawatt

(non-individual)

Suggest a correction

(vii)

above 1

megawatt, and up to and including 10

megawatts

(non-individual)

Suggest a correction

(viii)

above 10

megawatts, and up to and including 30

megawatts

(non-individual)

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a) above—

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

Suggest a correction

(i)

use as installation in building or building structures

+ 0.1550

21 years 10%

P.U. (A) 307 13

First

Column

Second

Column

Third

Column

Fourth

Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

Suggest a correction

(iii)

use of solar photovoltaic modules manufactured or assembled in Malaysia

+ 0.05 21 years 0%

Suggest a correction

(iv)

use of solar inverters manufactured or assembled in Malaysia

+ 0.05 21 years 0%”.

Made 28 December 2015

[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Minister of Energy, Green Technology and Water

Suggest a correction

Common questions

What is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 is Malaysia P.U. (A), cited as P.U. (A) 307 2015, currently marked in force and first recorded in 2015.
Is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 still in force?
Yes — PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 is currently in force.
When did PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 take effect?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 was first recorded in 2015.
How many sections does PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 have?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 contains 22 sections.
Where can I read the official version of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015?
The official text of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 is published at lom.agc.gov.my.
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) (NO. 2) 2015 (No. 307)