Skip to content
P.U. (A)In force

Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Enacted
2022
Sections
7

Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 is Malaysia P.U. (A), cited as P.U. (A) 382 2022, currently marked in force and first recorded in 2022.

Front matterCover and publication detailsOpen

WARTA KERAJAAN PERSEKUTUAN

FEDERAL GOVERNMENT

GAZETTE

PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT)

(PINDAAN) (NO. 17) 2022

FEDERAL ROADS (WEST MALAYSIA) (AMENDMENT)

(NO. 17) ORDER 2022

DISIARKAN OLEH/

JABATAN PEGUAM NEGARA/

ATTORNEY GENERAL’S CHAMBERS

2

AKTA JALAN PERSEKUTUAN 1959

PERINTAH JALAN PERSEKUTUAN (MALAYSIA BARAT) (PINDAAN) (NO. 17) 2022

Opening note

Preamble

  1. PADA menjalankan kuasa yang diberikan oleh seksyen 3 Akta Jalan Persekutuan 1959 [Akta 376], Menteri, setelah berunding dengan Kerajaan Negeri Perak, membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Pindaan Jadual Pertama

Perintah Jalan Persekutuan (Malaysia Barat) 1989 [P.U. (A) 401/1989] dipinda dalam Jadual Pertama di bawah kepala “Negeri Perak Darul Ridzuan”—

(a)

dengan menggantikan butiran 3 dengan butiran yang berikut:

“3.

(Laluan 1): Jalan Ipoh – Butterworth

Bermula di persimpangan Taman Makmur Sungai Siput (Utara)

di koordinat U 4.826535, T 101.053287 dan berakhir di sempadan negeri Negeri Perak/Pulau Pinang di koordinat U 5.130852,

T

471721

di dalam hak lalu-lalang sebagaimana yang ditunjukkan dalam PETA 16: JALAN IPOH-BUTTERWORTH

(jarak sepanjang 92.493 km).”;

3

(b)

dengan memasukkan selepas butiran 30 butiran yang berikut:

“31.

(Laluan 1): Jalan Tun Dr. S. Samy Vellu

Dari sempadan daerah Daerah Kinta/Kuala Kangsar di koordinat

U 4.775443, T 101.113049 dan berakhir di persimpangan

Taman Makmur Sungai Siput (Utara) di koordinat U 4.826535,

T 101.053287 di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam PETA 17: JALAN TUN DR. S. SAMY VELLU

(jarak sepanjang 9.355 km).”; dan

(c)

dengan memasukkan selepas PETA 15: JALAN BAGAN SERAI-KUALA

KURAU peta yang berikut:

4

“PETA 16: JALAN IPOH-BUTTERWORTH

5

PETA 17 : JALAN TUN DR. S. SAMY VELLU

Dibuat 14 Disember 2022

[KKR.100-1/2/25; PN(PU2)391/Jld. 43]

DATO SRI ALEXANDER NANTA LINGGI

Menteri Kerja Raya

[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]

”.

6

FEDERAL ROADS ACT 1959

FEDERAL ROADS (WEST MALAYSIA) (AMENDMENT) (NO. 17) ORDER 2022

Opening note

Preamble

  1. IN exercise of the powers conferred by section 3 of the Federal Roads Act 1959 [Act 376], the Minister, after consultation with the State Government of Perak, makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Federal Roads (West Malaysia)

(Amendment) (No. 17) Order 2022.

(2)

This Order comes into operation on 31 December 2022.

Amendment of First Schedule 2.

The Federal Roads (West Malaysia) Order 1989 [P.U. (A) 401/1989] is amended in the First Schedule under the heading of “Negeri Perak Darul Ridzuan”—

(a)

by substituting for item 3 the following item:

“3.

(Route 1): Ipoh – Butterworth Road

Starting at junction of Taman Makmur Sungai Siput (North)

at coordinates N 4.826535, E 101.053287 and ending at state boundary of Negeri Perak/Pulau Pinang at coordinates

N

Seksyen 100

471721

within the boundaries of right of way as shown on MAP 16: IPOH-BUTTERWORTH ROAD

(a distance of 92.493 km).”;

7

(b)

by inserting after item 30 the following item:

“31.

(Route 1): Tun Dr. S. Samy Vellu Road

From Daerah Kinta/Kuala Kangsar district boundary at coordinates

N

113049

and ending at junction of Taman Makmur Sungai Siput (North) at coordinates N 4.826535,

E 101.053287 within the boundaries of right of way as shown on

MAP 17: TUN DR. S. SAMY VELLU ROAD (a distance of 9.355 km).”;

and

(c)

by inserting after MAP 15: BAGAN SERAI-KUALA KURAU ROAD the following maps:

8

“MAP 16: IPOH-BUTTERWORTH ROAD

9

MAP 17: TUN DR. S. SAMY VELLU ROAD

Made 14 December 2022

[KKR.100-1/2/25; PN(PU2)391/Jld. 43]

DATO SRI ALEXANDER NANTA LINGGI

Minister of Works

[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]

”.

Common questions

What is Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022?
Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 is Malaysia P.U. (A), cited as P.U. (A) 382 2022, currently marked in force and first recorded in 2022.
Is Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 still in force?
Yes — Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 is currently in force.
When did Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 take effect?
Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 was first recorded in 2022.
How many sections does Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 have?
Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 contains 7 sections.
Where can I read the official version of Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022?
The official text of Perintah Jalan Persekutuan (Malaysia Barat) (Pindaan) (No. 17) 2022 is published at lom.agc.gov.my.

Something wrong on this page?

If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.