/akn/my/act/pua/2025/102

PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2025
Sections
4

Quick answer

About this p.u. (a)

PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 is Malaysia P.U. (A), cited as P.U. (A) 102 2025, currently marked in force and first recorded in 2025.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 5 Akta Industri Perkhidmatan Air 2006 [Akta 655], Menteri, atas syor Suruhanjaya, membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Dalam Perintah ini—

Open as pageSuggest a correction

“Kawasan Terengganu Tengah” mempunyai erti yang diberikan kepadanya dalam

Akta Lembaga Kemajuan Terengganu Tengah 1973 [Akta 104];

“Lembaga

Kemajuan Terengganu

Tengah” ertinya

Lembaga

Kemajuan

Terengganu Tengah yang ditubuhkan di bawah seksyen 3 Akta Lembaga Kemajuan

Terengganu Tengah 1973.

Seksyen 3

Pengecualian

Open as pageSuggest a correction

Menteri mengecualikan Lembaga Kemajuan Terengganu Tengah daripada kehendak bagi lesen individu di bawah seksyen 4 Akta bagi kerja pengendalian dan penyenggaraan sistem pembetungan awam di Kawasan Terengganu Tengah,

Terengganu.

Seksyen 4

Syarat pengecualian

Open as pageSuggest a correction

Lembaga Kemajuan Terengganu Tengah hendaklah—

P.U. (A) 102 3

(a)

mendapatkan peruntukan kewangan untuk menjalankan suatu kajian pelan induk tadahan pembetungan bagi maksud mengenal pasti keperluan bagi pembaikpulihan dan peningkatan sistem pembetungan di Kawasan

Terengganu Tengah;

Suggest a correction

(b)

mendapatkan peruntukan kewangan untuk menjalankan kerja pembaikpulihan dan peningkatan bagi sistem pembetungan berdasarkan hasil kajian pelan induk tadahan pembetungan yang diluluskan;

Suggest a correction

(c)

menjalankan kerja menyahenap cemar dan menyahlodak di kolam oksidasi secara berkala; dan

Suggest a correction

(d)

melantik seseorang yang bertauliah untuk menjalankan suatu persampelan kualiti efluen di loji rawatan kumbahan secara berkala sekurang-kurangnya sebulan sekali, selepas kerja menyahenap cemar dan menyahlodak di kolam oksidasi telah dijalankan.

Dibuat 26 Mac 2025

[PETRA.BAP.100-1/1/3(S)KLT.4; PN(PU2)660/JLD.19]

DATO' SRI HAJI FADILLAH BIN HAJI YUSOF

Menteri Peralihan Tenaga dan Transformasi Air

P.U. (A) 102 4

WATER SERVICES INDUSTRY ACT 2006

WATER SERVICES INDUSTRY (LICENSING) (EXEMPTION) ORDER 2025

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 5 of the Water Services Industry Act 2006 [Act 655], the Minister, upon the recommendation of the Commission, makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Water Services Industry (Licensing)

(Exemption) Order 2025.

Suggest a correction

(2)

This Order has effect for the period from 1 April 2025 to 31 March 2026.

Interpretation 2.

In this Order—

“Kawasan Terengganu Tengah” has the meaning assigned to it in the Lembaga

Kemajuan Terengganu Tengah Act 1973 [Act 104];

“Lembaga Kemajuan Terengganu Tengah” means the Lembaga Kemajuan

Terengganu Tengah established under section 3 of the Lembaga Kemajuan Terengganu

Tengah Act 1973.

Exemption 3.

The Minister exempts the Lembaga Kemajuan Terengganu Tengah from the requirement for individual licence under section 4 of the Act for the operation and maintenance of the public sewerage system in the Kawasan Terengganu Tengah,

Terengganu.

Conditions of exemption 4.

The exemption under paragraph 3 is subject to the conditions that the Lembaga

Kemajuan Terengganu Tengah shall—

P.U. (A) 102 5

(a)

obtain financial allocations to carry out a sewerage catchment master plan study for the purpose of identifying the needs for refurbishment and upgrading of the sewerage system in the Kawasan Terengganu Tengah;

Suggest a correction

(b)

obtain financial allocations to carry out refurbishment and upgrading works for the sewerage system based on the outcome of the approved sewerage catchment master plan study;

Suggest a correction

(c)

carry out desludging and desilting works in oxidation ponds periodically;

and

Suggest a correction

(d)

appoint an accredited person to carry out an effluent quality sampling in the sewage treatment plant periodically, at least once a month, after the desludging and desilting works in the oxidation ponds have been carried out.

Made 26 March 2025

[PETRA.BAP.100-1/1/3(S)KLT.4; PN(PU2)660/JLD.19]

DATO' SRI HAJI FADILLAH BIN HAJI YUSOF

Minister of Energy Transition and Water Transformation

Suggest a correction
Suggest a correction

Common questions

What is PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025?
PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 is Malaysia P.U. (A), cited as P.U. (A) 102 2025, currently marked in force and first recorded in 2025.
Is PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 still in force?
Yes — PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 is currently in force.
When did PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 take effect?
PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 was first recorded in 2025.
How many sections does PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 have?
PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 contains 4 sections.
Where can I read the official version of PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025?
The official text of PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 is published at lom.agc.gov.my.
PERINTAH INDUSTRI PERKHIDMATAN AIR (PELESENAN) (PENGECUALIAN) 2025 (No. 102)