PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2025
Sections
9

Quick answer

About this p.u. (a)

PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 is Malaysia P.U. (A), cited as P.U. (A) 23 2025, currently marked in force and first recorded in 2025.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh subseksyen 69(2) Akta Pengangkutan Jalan 1987 [Akta 333], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

(1)

Perintah ini bolehlah dinamakan Perintah Had Laju (Lebuh Raya

Pesisiran Pantai Barat (Taiping-Banting)) (Pindaan) 2025.

Suggest a correction

(2)

Perintah ini mula berkuat kuasa pada 21 Januari 2025.

Pindaan perenggan 2

Suggest a correction

Seksyen 2

Perintah Had Laju (Lebuh Raya Pesisiran Pantai Barat (Taiping-Banting)) 2019

Open as pageSuggest a correction

[P.U. (A) 153/2019], yang disebut “Perintah ibu” dalam Perintah ini, dipinda dalam subperenggan 2(2) dengan menggantikan perkataan “Peta A, Peta B dan Peta C” dengan perkataan “peta”.

(a)

dalam subbutiran (aa)(ii), dengan menggantikan noktah di hujung subbutiran itu dengan koma bernoktah; dan

Suggest a correction

(b)

dengan memasukkan selepas butiran (aa) butiran yang berikut:

Suggest a correction

(2)

Had Laju

(km/j)

“(bb) Persimpangan Bertingkat SAE dari—

P.U. (A) 23 3

Suggest a correction

(i)

Had

Sempadan

Penyenggaraan di koordinat U 328556.824, T 390727.852

Grid RSO Geosentrik (GDM 2000) dan berakhir di koordinat U 330514.338,

Suggest a correction

(ii)

Had

Sempadan

Penyenggaraan di koordinat U 330154.927, T 388445.311

Grid RSO Geosentrik (GDM 2000) dan berakhir di koordinat U 330403.079,

Suggest a correction

(iii)

Had

Sempadan

Penyenggaraan di koordinat U 330170.670, T 388179.046

Grid RSO Geosentrik (GDM 2000) dan berakhir di koordinat U 330514.338,

Suggest a correction

Seksyen 388087

Suggest a correction

234

Grid

Geosentrik

(GDM 2000) (Ramp F–Ramp H); dan

(iv)

Had

Sempadan

Penyenggaraan di koordinat U 328463.365, T 390727.852

Grid RSO Geosentrik (GDM 2000) dan berakhir di Had Sempadan Penyenggaraan di koordinat U 330403.079, T 388117.616

Grid

Geosentrik

2000)

(Ramp G–Ramp B); dan 50

50

50

50

P.U. (A) 23 4

Suggest a correction

(i)

koordinat U 324771.285, T 391062.321

Grid RSO Geosentrik (GDM 2000) dan berakhir di Had Sempadan Penyenggaraan di koordinat U 323419.706, T 390991.036

Grid

Geosentrik

2000)

(Ramp C–Ramp E); dan

Suggest a correction

(ii)

koordinat U 324685.714, T 391146.799

Grid RSO Geosentrik (GDM 2000) dan berakhir di Had Sempadan Penyenggaraan di koordinat U 323419.706, T 390991.036

Grid

Geosentrik

2000)

(Ramp A–Ramp E).

50

50”.

Pindaan Jadual Kedua

Suggest a correction

Seksyen 4

Perintah ibu dipinda dalam Jadual Kedua dengan memasukkan selepas

Open as pageSuggest a correction

PETA: PERSIMPANGAN BERTINGKAT SKVE peta yang berikut:

P.U. (A) 23 5

“PETA: PERSIMPANGAN BERTINGKAT SAE

P.U. (A) 23 6

”.

PETA: PERSIMPANGAN BERTINGKAT SKVE

Dibuat 17 Januari 2025

[KKR.PUU.110-1/6/20 Jld.2; PN(PU2)460/JLD.136]

DATO SRI ALEXANDER NANTA LINGGI

Menteri Kerja Raya

P.U. (A) 23

7

ROAD TRANSPORT ACT 1987

SPEED LIMIT (WEST COAST EXPRESSWAY (TAIPING-BANTING))

(AMENDMENT) ORDER 2025

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by subsection 69(2) of the Road Transport Act 1987 [Act 333], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Speed Limit (West Coast Expressway

(Taiping-Banting)) (Amendment) Order 2025.

Suggest a correction

(2)

This Order comes into operation on 21 January 2025.

Amendment of paragraph 2 2.

The Speed Limit (West Coast Expressway (Taiping-Banting)) Order 2019

[P.U. (A) 153/2019], which is referred to as the “principal Order” in this Order, is amended in subparagraph 2(2) by substituting for the words “Map A, Map B and Map C” the words

“the map”.

Amendment of First Schedule 3.

The principal Order is amended in the First Schedule—

Suggest a correction

(a)

in subitem (aa)(ii), by substituting for the full stop at the end of the subitem a semicolon; and

Suggest a correction

(b)

by inserting after item (aa) the following items:

Suggest a correction

(2)

Speed limit

(km/h)

“(bb) the SAE Interchange from—

P.U. (A) 23 8

Suggest a correction

(i)

the Limit of Maintenance Responsibilty at coordinates N 328556.824, E 390727.852

of the RSO Geocentric (GDM 2000) Grid and ending at coordinates N 330514.338,

E 388087.234 of the RSO Geocentric

(GDM 2000) Grid (Ramp E – Ramp H);

Suggest a correction

(ii)

the Limit of Maintenance Responsibilty at coordinates N 330154.927, E 388445.311

of the RSO Geocentric (GDM 2000) Grid and ending at coordinates N 330403.079,

E 388117.616 of the RSO Geocentric

(GDM 2000) Grid (Ramp D–Ramp B);

Suggest a correction

(iii)

the Limit of Maintenance Responsibilty at coordinates N 330170.670, E 388179.046

of the RSO Geocentric (GDM 2000) Grid and ending at coordinates N 330514.338,

E 388087.234 of the RSO Geocentric

(GDM 2000) Grid (Ramp F–Ramp H); and

Suggest a correction

(iv)

the Limit of Maintenance Responsibilty at coordinates N 328463.365, E 390727.852

of the RSO Geocentric (GDM 2000)

Grid and ending at the

Limit of

Maintenance Responsibility at coordinates

N 330403.079, E 388117.616 of the

Geocentric

2000)

Grid

(Ramp G–Ramp B); and

50

50

50

50

P.U. (A) 23 9

Suggest a correction

Seksyen 324771

Open as pageSuggest a correction

285,

E 391062.321 of the RSO Geocentric

(GDM 2000) Grid and ending at the Limit of

Maintenance Responsibility at coordinates

N 323419.706, E 390991.036 of the

Geocentric

2000)

Grid

(Ramp C–Ramp E); and

Seksyen 324685

Open as pageSuggest a correction

714,

E 391146.799 of the RSO Geocentric

(GDM 2000) Grid and ending at the Limit of

Maintenance Responsibility at coordinates

N 323419.706 E 390991.036 of the

Geocentric

2000)

Grid

(Ramp A–Ramp E).

50

50”.

Amendment of Second Schedule 4.

The principal Order is amended in the Second Schedule by inserting after

MAP: SKVE INTERCHANGE the following maps:

P.U. (A) 23 10

“MAP: SAE INTERCHANGE

P.U. (A) 23 11

”.

MAP: SKVE INTERCHANGE

Made 17 January 2025

[KKR.PUU.110-1/6/20 Jld.2; PN(PU2)460/JLD.136]

DATO SRI ALEXANDER NANTA LINGGI

Minister of Works

Common questions

What is PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025?
PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 is Malaysia P.U. (A), cited as P.U. (A) 23 2025, currently marked in force and first recorded in 2025.
Is PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 still in force?
Yes — PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 is currently in force.
When did PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 take effect?
PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 was first recorded in 2025.
How many sections does PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 have?
PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 contains 9 sections.
Where can I read the official version of PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025?
The official text of PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 is published at lom.agc.gov.my.
PERINTAH HAD LAJU (LEBUH RAYA PESISIRAN PANTAI BARAT (TAIPING-BANTING)) (PINDAAN) 2025 (No. 23)