Section 23
Section 23
(2)
Upon the determination by the Commission that a particular renewable energy installation has achieved grid parity, the Commission shall notify the relevant feed-in approval holder and distribution licensee of such achievement.
(3)
Notwithstanding anything under this Enactment, upon notification of the determination of grid parity under subsection (2) —
(a)
a feed-in approval holder who owns such renewable energy installation shall not be entitled to be paid the feed-in tariff and shall instead be paid by the distribution licensee a tariff that is based on the prevailing displaced cost for the remaining duration of the effective period; and
(b)
a distribution licensee shall not be entitled to recover from the
Fund the sum referred to in section 21 and be paid administrative fees under paragraph 22(a) in respect of any renewable energy installation.