(a)

subject to subrules (2) and (3), the feed-in approval holder shall continue to comply with the eligibility criteria described in rule 3;

(b)

the feed-in approval holder shall meet such milestones by such dates as may be determined by the Commission;

(c)

the feed-in approval holder shall observe and comply with the conditions

14

of his or its feed-in approval, the provisions of the Enactment and any subsidiary legislation made under the Enactment, and all other applicable laws;

(d)

the feed-in approval holder shall provide information, in such format and at such intervals, as may be required by the Commission in accordance with the Enactment and its subsidiary legislation;

(e)

subject to subrule (2), the feed-in approval holder shall obtain written approval of the Commission in respect of any change in circumstances —

(i)

which would result in the feed-in approval holder not complying with the eligibility criteria described in rule 3; and

(ii)

which would otherwise result in the feed-in approval holder being no longer entitled to be granted a feed-in approval under the Enactment and these Rules; and

(f)

the feed-in approval holder shall comply with such other conditions as may be determined by the Commission from time to time.

(2)

Where a feed-in approval of a renewable energy installation has been assigned or transferred to a distribution licensee or an associate of the distribution licensee due to a breach of a renewable energy power purchase agreement by a feed-in approval holder or a distribution licensee, the distribution licensee or associate of the distribution licensee is not required to comply with paragraph (l)(a) within twelve months from the date of such assignment or transfer or such longer period as may be approved by the Commission.

(3)

A feed-in approval holder shall not make or permit to be made any material modification to the design or physical form of the renewable energy installation except with the prior written consent of the Commission if the modification results in any change in any information earlier submitted by or on behalf of the feed-in approval holder to the Commission in the application for a feed-in approval under these Rules.

(4)

After the expiry of the period referred to in subrule (2), the distribution licensee or associate of the distribution licensee shall comply with the standard conditions specified in paragraph (1)(a) by selling its rights, titles and interests in the renewable energy installation so that the distribution licensee’s or the associate

15

of the distribution licensee'es direct or indirect ownership of the renewable energy installation shall not exceed forty-nine per centum.

Application to relocate renewable energy installation utilizing solar photovoltaic

Section 14 — Sabah Renewable Energy Feed Approval And Feed Tariff Rate Rules 2024