Section 2
In these Rules, unless the context otherwise requires —
of Sabah Renewable Energy Renewable Energy Power Purchase Agreement Rules 2024
“connection point” has the meaning assigned to it in rule 2 of the Sabah
Renewable Energy (Technical and Operational Requirements) Rules 2024;
“kW” has the meaning assigned to it in rule 2 of the Sabah Renewable Energy
(Technical and Operational Requirements) Rules 2024;
“kWp” has the meaning assigned to it in rule 2 of the Sabah Renewable Energy
(Technical and Operational Requirements) Rules 2024;
“MW” has the meaning assigned to it in rule 2 of the Sabah Renewable Energy
(Technical and Operational Requirements) Rules 2024;
“net export capacity” has the meaning assigned to it in rule 2 of the Sabah
Renewable Energy (Technical and Operational Requirements) Rules 2024;
“rated kWp” has the meaning assigned to it in rule 2 of the Sabah Renewable
Energy (Technical and Operational Requirements) Rules 2024; and
3
“revenue meter” has the meaning assigned to it in rule 2 of the Sabah Renewable
Energy (Technical and Operational Requirements) Rules 2024.
Distribution licensee is to enter into renewable energy power purchase agreement