Malaysia legislation

Section 2

of Sabah Renewable Energy Renewable Energy Power Purchase Agreement Rules 2024

Section 2

In these Rules, unless the context otherwise requires —

“connection point” has the meaning assigned to it in rule 2 of the Sabah

Renewable Energy (Technical and Operational Requirements) Rules 2024;

“kW” has the meaning assigned to it in rule 2 of the Sabah Renewable Energy

(Technical and Operational Requirements) Rules 2024;

“kWp” has the meaning assigned to it in rule 2 of the Sabah Renewable Energy

(Technical and Operational Requirements) Rules 2024;

“MW” has the meaning assigned to it in rule 2 of the Sabah Renewable Energy

(Technical and Operational Requirements) Rules 2024;

“net export capacity” has the meaning assigned to it in rule 2 of the Sabah

Renewable Energy (Technical and Operational Requirements) Rules 2024;

“rated kWp” has the meaning assigned to it in rule 2 of the Sabah Renewable

Energy (Technical and Operational Requirements) Rules 2024; and

3

“revenue meter” has the meaning assigned to it in rule 2 of the Sabah Renewable

Energy (Technical and Operational Requirements) Rules 2024.

Section 2 — Sabah Renewable Energy Renewable Energy Power Purchase Agreement Rules 2024