Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Enacted
2025
Sections
3

Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 is Malaysia P.U. (A), cited as P.U. (A) 218 2025, currently marked in force and first recorded in 2025.

Front matterCover and publication detailsOpen

P.U. (A) 218

WARTA KERAJAAN PERSEKUTUAN

FEDERAL GOVERNMENT

GAZETTE

PERINTAH JALAN PERSEKUTUAN (SARAWAK)

(PINDAAN) (NO. 3) 2025

FEDERAL ROADS (SARAWAK) (AMENDMENT) (NO. 3)

ORDER 2025

DISIARKAN OLEH/

JABATAN PEGUAM NEGARA/

ATTORNEY GENERAL’S CHAMBERS

P.U. (A) 218 2

AKTA JALAN PERSEKUTUAN 1959

PERINTAH JALAN PERSEKUTUAN (SARAWAK) (PINDAAN) (NO. 3) 2025

Opening note

Preamble

  1. PADA menjalankan kuasa yang diberikan oleh seksyen 3 Akta Jalan Persekutuan 1959 [Akta 376], Menteri, setelah berunding dengan Kerajaan Negeri Sarawak, membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Perintah Jalan Persekutuan (Sarawak) 1996 [P.U. (A) 551/1996], yang disebut

“Perintah ibu” dalam Perintah ini, dipinda dalam Jadual Pertama di bawah kepala

LEBUH RAYA PAN BORNEO, dengan memasukkan selepas butiran (ju) butiran yang berikut:

“(jv)

(Laluan 1): Jambatan Sungai Awik-Sekolah Kebangsaan Sungai Paoh

Bermula di koordinat U 1.778582, T 111.372797 dan berakhir di koordinat U 2.010640, T 111.464801 termasuk jalan sambungannya di dalam sempadan hak lalu-lalang sebagaimana yang ditunjukkan dalam

PETA JAMBATAN SUNGAI AWIK-SEKOLAH KEBANGSAAN SUNGAI PAOH

(jarak sepanjang 37.445 km).”.

Pindaan Jadual Ketiga

Perintah ibu dipinda dalam Jadual Ketiga dengan memasukkan selepas

PETA

PEKAN

TATAU-PERSIMPANGAN

LAPANGAN

TERBANG

BINTULU peta yang berikut:

P.U. (A) 218 3

”.

“PETA JAMBATAN SUNGAI AWIK-SEKOLAH KEBANGSAAN SUNGAI PAOH

Dibuat 16 Julai 2025

[KKR.100-1/2/23; PN(PU2)391/JLD.52]

DATO SRI ALEXANDER NANTA LINGGI

Menteri Kerja Raya

[Akan dibentangkan di Dewan Rakyat menurut seksyen 4 Akta Jalan Persekutuan 1959]

P.U. (A) 218 4

FEDERAL ROADS ACT 1959

FEDERAL ROADS (SARAWAK) (AMENDMENT) (NO. 3) ORDER 2025

Opening note

Preamble

  1. IN exercise of the powers conferred by section 3 of the Federal Roads Act 1959 [Act 376], the Minister, after consultation with the State Government of Sarawak, makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Federal Roads (Sarawak) (Amendment)

(No. 3) Order 2025.

(2)

This Order comes into operation on 18 July 2025.

Amendment of First Schedule 2.

The Federal Roads (Sarawak) Order 1996 [P.U. (A) 551/1991], which is referred to as the “principal Order” in this Order, is amended in the First Schedule under the heading of PAN BORNEO HIGHWAY, by inserting after item (ju) the following item:

“(jv)

(Route 1): Sungai Awik Bridge-Sekolah Kebangsaan Sungai Paoh

Starting at coordinates N 1.778582, E 111.372797 and ending at coordinates N 2.010640, E 111.464801 including its link road within the boundaries of right of way as shown on MAP OF SUNGAI AWIK

BRIDGE-SEKOLAH

KEBANGSAAN

SUNGAI

PAOH

(a distance of 37.445 km).’’.

Amendment of Third Schedule 3.

The principal Order is amended in the Third Schedule by inserting after

MAP OF TATAU TOWN-BINTULU AIRPORT INTERSECTION the following map:

P.U. (A) 218 5

”.

“MAP OF SUNGAI AWIK BRIDGE-SEKOLAH KEBANGSAAN SUNGAI PAOH

Made 16 July 2025

[KKR.100-1/2/23; PN(PU2)391/JLD.52]

DATO SRI ALEXANDER NANTA LINGGI

Minister of Works

[To be laid before the Dewan Rakyat pursuant to section 4 of the Federal Roads Act 1959]

Common questions

What is Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025?
Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 is Malaysia P.U. (A), cited as P.U. (A) 218 2025, currently marked in force and first recorded in 2025.
Is Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 still in force?
Yes — Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 is currently in force.
When did Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 take effect?
Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 was first recorded in 2025.
How many sections does Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 have?
Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 contains 3 sections.
Where can I read the official version of Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025?
The official text of Perintah Jalan Persekutuan (Sarawak) (Pindaan) (No. 3) 2025 is published at lom.agc.gov.my.

Something wrong on this page?

If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.