Malaysia legislation

Section 15

of Environment Protection Control Pig Farming Pollution Rules 2008

Section 15

(1)

Any application for renewal of a permit during the interim period shall be submitted to the Director at least two months before the date of expiry of the permit.

(2)

If the application meets the requirements specified under these Rules, the

Director shall renew the permit by issuing a new permit.

Conditions or restrictions of permit

Section 15 — Environment Protection Control Pig Farming Pollution Rules 2008