/akn/my/act/pua/2017/53

PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2017
Sections
10

Quick answer

About this p.u. (a)

PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 is Malaysia P.U. (A), cited as P.U. (A) 53 2017, currently marked in force and first recorded in 2017.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 39 Akta Bekalan Gas 1993 [Akta 501], Menteri membuat peraturan-peraturan yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Peraturan-Peraturan Bekalan Gas 1997 [P.U. (A) 287/1997], yang disebut

Open as pageSuggest a correction

(a)

dengan menggantikan perenggan (a) dengan perenggan yang berikut:

“(a)

lesen pengimportan ke terminal penggasan semula;”;

Suggest a correction

(b)

dengan menggantikan perenggan (b) dengan perenggan yang berikut:

“(b)

lesen penggasan semula;”; dan

Suggest a correction

(c)

dengan memasukkan selepas perenggan (b) perenggan yang berikut:

“(c)

lesen pengiriman;

Suggest a correction

Seksyen 3

“Peraturan-Peraturan ibu” dalam Peraturan-Peraturan ini, dipinda dalam peraturan 4 —

Open as pageSuggest a correction

(a)

dalam nota birai, dengan memotong perkataan “penggunaan gas”; dan

Suggest a correction

(b)

dalam subperaturan (1), dengan menggantikan perkataan “lesen penggunaan gas hendaklah mengemukakan permohonan kepada Suruhanjaya berserta butir-butir yang disebut dalam subseksyen 11(3)” dengan perkataan

“lesen untuk menjalankan apa-apa aktiviti di bawah seksyen 11 Akta hendaklah mengemukakan permohonan kepada Suruhanjaya berserta butir-butir yang dinyatakan dalam seksyen 11A”.

Pindaan peraturan 6

Suggest a correction

Seksyen 4

Peraturan 6 Peraturan-Peraturan ibu dipinda—

Open as pageSuggest a correction

(a)

dalam nota birai, dengan memotong perkataan “penggunaan gas”;

Suggest a correction

(b)

dengan memotong perkataan “penggunaan gas”; dan

Suggest a correction

(c)

dengan memotong perkataan “membayar fi pendahuluan pada kadar yang ditentukan oleh Suruhanjaya dan kemudiannya hendaklah”.

Pemotongan peraturan 7, 8 dan 9

Suggest a correction

Seksyen 6

Pindaan peraturan 10

Open as pageSuggest a correction

(a)

, dengan menggantikan perkataan

“lesen penggunaan gas,” dengan perkataan “lesen pengimportan ke terminal penggasan semula, lesen penggasan semula, lesen pengiriman, lesen pengangkutan atau lesen pengagihan,”; dan

(ii)

dalam perenggan (b), dengan memasukkan selepas perkataan

“lesen gas persendirian” perkataan “atau lesen peruncitan”;

Suggest a correction
Suggest a correction

(2)

, dengan memasukkan selepas perkataan

“pembaharuan lesen” perkataan “di bawah perenggan (1)(b)”; dan

(c)

dengan memasukkan selepas subperaturan (2) subperaturan yang berikut:

“(3) Bagi maksud subperaturan (2), lesen hendaklah sah bagi tempoh dua belas bulan dari tarikh pembaharuan.”.

Pindaan peraturan 11

Suggest a correction
Suggest a correction

Seksyen 7

Subperaturan 11(1) Peraturan-Peraturan ibu dipinda—

Open as pageSuggest a correction

(a)

dalam perenggan (a), dengan memotong perkataan “gas”;

Suggest a correction

(i)

dengan memotong perkataan “gas”; dan

(ii)

dengan memotong perkataan “atau” di hujung perenggan itu;

Suggest a correction
Suggest a correction

(c)

dalam perenggan (c), dengan menggantikan perkataan “Peraturan-Peraturan ini.” dengan perkataan “Peraturan-Peraturan ini atau mana-mana Kod yang dikeluarkan di bawah Akta; atau”; dan

P.U. (A) 53 5

Suggest a correction

(d)

dengan memasukkan selepas perenggan (c) perenggan yang berikut:

“(d)

lesen itu diberikan berdasarkan pemberian maklumat yang palsu, tidak benar atau mengelirukan.”.

Pindaan peraturan 12

Suggest a correction

Seksyen 8

Peraturan 12 Peraturan-Peraturan ibu dipinda—

Open as pageSuggest a correction

(a)

dalam nota birai, dengan menggantikan perkataan “Pemegang Lesen

Penggunaan Gas” dengan perkataan “pemegang lesen pengagihan, peruncitan dan gas persendirian”;

Suggest a correction

(i)

dengan menggantikan perkataan “Lesen Pengunaan Gas” dengan perkataan “lesen pengagihan, peruncitan dan gas persendirian”; dan

(ii)

dengan menggantikan perkataan “pepasangan gas” dengan perkataan

“pepasangan”;

Suggest a correction
Suggest a correction

(i)

dengan menggantikan perenggan (a) dengan perenggan yang berikut:

“(a) butir-butir lokasi pepasangan;”;

(ii)

dalam perenggan (d), dengan memasukkan sebelum perkataan

“Perakuan” perkataan “suatu salinan”; dan

Suggest a correction

(iii)

dengan menggantikan perenggan (e) dengan perenggan yang berikut:

“(e) suatu salinan Perakuan Ujian;”; dan

P.U. (A) 53 6

Suggest a correction
Suggest a correction

(i)

dengan menggantikan perkataan “Pemegang Lesen Penggunaan Gas”

dengan perkataan “pemegang lesen pengagihan, peruncitan atau gas persendirian”; dan

(ii)

dengan menggantikan perenggan (b) dengan perenggan yang berikut:

“(b)

bilangan kerosakan pepasangan dan kemalangan yang melibatkan talian paip pengagihan atau sistem perpaipan, mengikut mana-mana yang berkenaan;”.

Pindaan Jadual Ketiga

Suggest a correction
Suggest a correction

Jadual

Suggest a correction

Jadual Ketiga kepada Peraturan-Peraturan ibu dipinda—

(a)

dengan memotong perkataan

“9,”

yang terdapat di bawah tajuk

“JADUAL KETIGA”; dan

(b)

dalam Bahagian I—

(i)

dengan menggantikan perenggan 1 dengan perenggan yang berikut:

“1.

Fi bagi lesen untuk menjalankan aktiviti di bawah seksyen 11 Akta (Peraturan 6)

(a)

Lesen penggasan semula

Fi hendaklah berdasarkan kapasiti simpanan bagi kemudahan yang berkaitan. Fi yang

P.U. (A) 53 7

dikenakan ialah 0.5

sen/MMBTU

(MMBTU-Million British Thermal Unit)

(b)

Lesen pengangkutan gas

Fi hendaklah berdasarkan kapasiti simpanan bagi kemudahan yang berkaitan. Fi yang dikenakan ialah 0.5 sen/MMBTU

(c)

Lesen pengagihan gas

Fi hendaklah berdasarkan kapasiti simpanan bagi kemudahan yang berkaitan. Fi yang dikenakan ialah 1 sen/MMBTU

(d)

Lesen pengimportan ke terminal penggasan semula

Fi hendaklah berdasarkan kapasiti simpanan bagi kemudahan yang berkaitan. Fi yang dikenakan ialah 0.1 sen/MMBTU

(e)

Lesen pengiriman gas

Fi hendaklah berdasarkan kapasiti simpanan bagi kemudahan yang berkaitan. Unit fi yang dikenakan ialah 0.1 sen/MMBTU

P.U. (A) 53 8

(f)

Lesen peruncitan gas

Fi hendaklah berdasarkan kelas pepasangan seperti yang berikut:

RM setahun

i. pepasangan Kelas I ii. pepasangan Kelas II iii. pepasangan Kelas III

600.00 400.00 200.00

(g)

Lesen gas persendirian

Fi hendaklah berdasarkan kelas pepasangan seperti yang berikut:

RM setahun

i. pepasangan Kelas I ii. pepasangan Kelas II iii. pepasangan Kelas III

300.00 200.00 100.00”; dan

(ii)

dengan memotong perenggan 2.

Dibuat 24 Januari 2017

[UPE(S)25/16/68 Sj. 1 Jld 20; PN(PU2)528]

DATO’ SRI MOHD. NAJIB BIN TUN HAJI ABDUL RAZAK

Perdana Menteri

P.U. (A) 53 9

GAS SUPPLY ACT 1993

GAS SUPPLY (AMENDMENT) REGULATIONS 2017

IN exercise of the powers conferred by section 39 of the Gas Supply Act 1993 [Act 501], the Minister makes the following regulations:

Citation and commencement 1.

(1)

These regulations may be cited as the Gas Supply (Amendment)

Regulations 2017.

(2)

These Regulations come into operation on 16 February 2017.

Amendment of regulation 4 2.

The Gas Supply Regulations 1997 [P.U. (A) 287/1997], which are referred to as the

“principal Regulations” in these Regulations, are amended in regulation 4—

(a)

by substituting for paragraph (a) the following paragraph:

“(a) import into regasification terminal licence;”;

(b)

by substituting for paragraph (b) the following paragraph:

“(b) regasification licence;”; and

(c)

by inserting after paragraph (b) the following paragraphs:

“(c) shipping licence;

(d)

transportation licence;

(e)

distribution licence;

(f)

retail licence;

(g)

private gas licence.”.

P.U. (A) 53 10

Amendment of regulation 5 3.

Regulation 5 of the principal Regulations is amended—

(a)

in the marginal note, by deleting the words “gas utility”; and

(b)

in subparagraph (1), by substituting for the words “gas utility licence shall submit the application to the Commission together with the details mentioned in subsection 11(3)” the words “licence to carry out any activity under section 11 of the Act shall submit the application to the Commission together with the details as specified in section 11A”.

Amendment of regulation 6 4.

Regulation 6 of the principal Regulations is amended—

(a)

in the marginal note, by deleting the words “gas utility”;

(b)

by deleting the words “gas utility”; and

(c)

by deleting the words “pay an initial fee at the rate as may be determined by the Commission and shall subsequently”.

Deletion of regulations 7, 8 and 9 5.

Regulations 7, 8 and 9 of the principal Regulations are deleted.

Amendment of regulation 10 6.

Regulation 10 of the principal Regulations is amended—

(a)

in subregulation (1)—

P.U. (A) 53 11

(i)

in paragraph (a), by substituting for the words “a gas utility licence,”

the words

“an import into regasification terminal licence, a regasification licence, a shipping licence, a transportation licence or a distribution licence,”; and

(iii)

in paragraph (b), by inserting after the words “private gas licence” the words “or retail licence”;

(b)

in subregulation (2), by inserting after the words “renewal of a licence”

the words “under paragraph (1)(b)”; and

(c)

by inserting after subregulation (2) the following subregulation:

“(3) For the purpose of subregulation (2), the licence shall be valid for a period of twelve months from the date of renewal.”.

Amendment of regulation 11 7.

Subregulation 11(1) of the principal Regulations is amended—

(a)

in paragraph (a), by deleting the word “gas”;

(b)

in paragraph (b)—

(i)

by deleting the word “gas”; and

(ii)

by deleting the word “or” at the end of the paragraph;

(c)

in paragraph (c), by substituting for the words “these Regulations.” the words

“these Regulations or any Codes issued under the Act; or”; and

P.U. (A) 53 12

(d)

by inserting after paragraph (c) the following paragraph:

“(d)

the licence was granted based on the submission of false, incorrect or misleading information.”.

Amendment of regulation 12 8.

Regulation 12 of the principal Regulations is amended—

(a)

in the marginal note, by substituting for the words “Gas Utility Licensee”

the words “distribution, retail and private gas licensee”;

(b)

in subregulation (1)—

(i)

by substituting for the words “The Gas Utility Licensee” the words

“A distribution, retail and private gas licensee”; and

(ii)

by substituting for the words “gas installations” the word “installations”;

(c)

in subregulation (2)—

(i)

by substituting for paragraph (a) the following paragraph:

“(a)

details of the location of the installation;”;

(ii)

in paragraph (d), by inserting before the word “Certificate” the words

“a copy of the ”; and

(iii)

by substituting for paragraph (e) the following paragraph:

“(e) a copy of the Test Certificate;”; and

P.U. (A) 53 13

(d)

in subregulation (3)—

(i)

by substituting for the words “Gas Utility Licensee” the words

“distribution, retail or private gas licensee”; and

(ii)

by substituting for paragraph (b) the following paragraph:

“(b)

the number of breakdowns of installations and accidents involving distribution pipelines or piping system, as the case may be;”.

Amendment of Third Schedule 9.

The Third Schedule to the principal Regulations is amended—

(a)

by deleting the words “9,” appearing under the title “THIRD SCHEDULE”; and

(b)

in Part I—

(i)

by substituting for paragraph 1 the following paragraph:

“1.

Fees to carry out activity under section 11 of the Act (Regulation 6)

(a)

Regasification licence

The fee shall be based on the reserved capacity for the relevant facility. The fee charged is 0.5 sen/MMBTU

(MMBTU

-

Million

British

Thermal Unit)

P.U. (A) 53 14

(b)

Transportation licence

The fee shall be based on the reserved capacity for the relevant facility. The fee charged is 0.5 sen/MMBTU

(c)

Distribution licence

The fee shall be based on the reserved capacity for the relevant facility. The fee charged is 1 sen/MMBTU

(d)

Import into regasification terminal licence

The fee shall be based on the reserved capacity for the relevant facility. The fee charged is 0.1 sen/MMBTU

(e)

Shipping licence

The fee shall be based on the reserved capacity for the relevant facility. The fee charged is 0.1 sen/MMBTU

P.U. (A) 53 15

(f)

Retail licence

The fee shall be based on the class of installation as follows:

RM per year

i. Class I installation ii. Class II installation iii. Class III installation 600.00 400.00 200.00

(g)

Private gas licence

The fee shall be based on the class of installation as follows:

RM per year i.

Class I installation ii.

Class II installation iii.

Class III installation 300.00 200.00 100.00”; and

(ii)

by deleting paragraph 2.

Made 24 January 2017

[UPE(S)25/16/68 Sj. 1 Jld 20; PN(PU2)528]

DATO’ SRI MOHD. NAJIB BIN TUN HAJI ABDUL RAZAK

Prime Minister

Common questions

What is PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017?
PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 is Malaysia P.U. (A), cited as P.U. (A) 53 2017, currently marked in force and first recorded in 2017.
Is PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 still in force?
Yes — PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 is currently in force.
When did PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 take effect?
PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 was first recorded in 2017.
How many sections does PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 have?
PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 contains 9 sections.
Where can I read the official version of PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017?
The official text of PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 is published at lom.agc.gov.my.
PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2017 (No. 53)