Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
- Enacted
- 2017
- Sections
- 3
Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 is Malaysia P.U. (A), cited as P.U. (A) 222 2017, currently marked in force and first recorded in 2017.
Front matterCover and publication detailsOpenClose
P.U. (A) 222
WARTA KERAJAAN PERSEKUTUAN
FEDERAL GOVERNMENT
GAZETTE
PERINTAH TENAGA BOLEH BAHARU
(PINDAAN JADUAL) 2017
RENEWABLE ENERGY
(AMENDMENT OF SCHEDULE) ORDER 2017
DISIARKAN OLEH/
JABATAN PEGUAM NEGARA/
ATTORNEY GENERAL’S CHAMBERS
P.U. (A) 222 2
AKTA TENAGA BOLEH BAHARU 2011
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017
Opening note
Preamble
- PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa
Seksyen 2
Jadual kepada Akta Tenaga Boleh Baharu 2011 dipinda berhubung dengan butiran
“Fotovolta suria”—
(a)
dengan memasukkan selepas subbutiran (a)(i) dan butir-butir yang berhubungan dengannya subbutiran dan butir-butir yang berikut:
Ruang
Pertama
Ruang Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
Fotovolta suria
(a)
Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang—
Kadar tarif galakan asas
“(ia) sehingga dan termasuk 4 kilowatt
(individu B40 0.7424
10 tahun 0%”;
P.U. (A) 222 3
Ruang
Pertama
Ruang Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan di bawah
Program
MySuria)
(b)
dengan memasukkan selepas subbutiran (b)(i) dan butir-butir yang berhubungan dengannya subbutiran dan butir-butir yang berikut:
Ruang
Pertama
Ruang Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
(b)
Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada
(a)
di atas—
Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas
“(ia) penggunaan sebagai pepasangan dalam bangunan atau struktur bangunan
(individu B40
+ 0.1395
10 tahun 0%”;
P.U. (A) 222 4
Ruang
Pertama
Ruang Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan di bawah
Program
MySuria)
(c)
dengan memasukkan selepas subbutiran (b)(ii) dan butir-butir yang berhubungan dengannya subbutiran dan butir-butir yang berikut:
Ruang
Pertama
Ruang Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan (dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
(b)
Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada
(a)
di atas—
Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas
“(iia) penggunaan sebagai bahan bangunan
(individu B40
di bawah
Program
MySuria)
+ 0.1060 10 tahun 0%”; dan
P.U. (A) 222 5
(d)
dengan memasukkan selepas subbutiran (b)(iii) dan butir-butir yang berhubungan dengannya subbutiran dan butir-butir yang berikut:
Ruang
Pertama
Ruang Kedua
Ruang
Ketiga
Ruang
Keempat
Ruang
Kelima
Sumber boleh baharu
Perihalan pepasangan tenaga boleh baharu yang layak
Kadar tarif galakan
(dalam ringgit bagi setiap kilowatt jam)
Tempoh berkuat kuasa
(bermula dari tarikh permulaan kuat kuasa tarif galakan)
Kadar pengurangan tahunan
(b)
Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada
(a)
di atas—
Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas
“(iiia) penggunaan modul fotovolta suria yang dibuat atau dipasang di Malaysia
(individu B40
di bawah
Program
MySuria)
+ 0.05 10 tahun 0%”.
Dibuat 27 Julai 2017
[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Menteri Tenaga, Teknologi Hijau dan Air
P.U. (A) 222 6
RENEWABLE ENERGY ACT 2011
RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) ORDER 2017
Opening note
Preamble
- IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.
(2)
This Order comes into operation on 1 August 2017.
Amendment of Schedule 2.
The Schedule to the Renewable Energy Act 2011 is amended in relation to the item
“Solar photovoltaic”—
(a)
by inserting after subitem (a)(i) and the particulars relating to it the following subitem and particulars:
First
Column
Second Column
Third Column
Fourth Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
Solar photovoltaic
(a)
Renewable energy installation having an installed capacity—
Basic feed-in tariff
“(ia) up to and including 4 kilowatts individual under MySuria
Programme)
Seksyen 0
7424
10 years 0%”;
P.U. (A) 222 7
(b)
by inserting after subitem (b)(i) and the particulars relating to it the following subitem and particulars:
First
Column
Second Column
Third
Column
Fourth Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a)
above—
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
“(ia) use as installations in building or building structures (B40
individual under MySuria
Programme)
+ 0.1395
10 years 0%”;
(c)
by inserting after subitem (b)(ii) and the particulars relating to it the following subitem and particulars:
First
Column
Second Column
Third Column
Fourth Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a) above—
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
“(iia) use as building materials individual under MySuria
Programme)
+ 0.1060
10 years 0%”; and
P.U. (A) 222 8
(d)
by inserting after subitem (b)(iii) and the particulars relating to it the following subitem and particulars:
First
Column
Second Column
Third
Column
Fourth Column
Fifth
Column
Renewable resources
Description of qualifying renewable energy installation
Feed-in tariff rate
(in ringgit per kilowatt hour)
Effective period
(commencing from the feed-in tariff commencement date)
Annual degression rate
(b)
Renewable energy installation having any one or more of the following criteria in addition to (a)
above—
Bonus feed-in tariff rate in addition to basic feed-in tariff rate
“(iiia)
use of solar photovoltaic modules manufactured or assembled in
Malaysia individual under MySuria
Programme)
+ 0.05 10 years 0%”.
Made 27 July 2017
[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]
DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI
Minister of Energy, Green Technology and Water
Common questions
- What is Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017?
- Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 is Malaysia P.U. (A), cited as P.U. (A) 222 2017, currently marked in force and first recorded in 2017.
- Is Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 still in force?
- Yes — Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 is currently in force.
- When did Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 take effect?
- Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 was first recorded in 2017.
- How many sections does Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 have?
- Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 contains 3 sections.
- Where can I read the official version of Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017?
- The official text of Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2017 is published at lom.agc.gov.my.
Something wrong on this page?
If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.