/akn/my/act/pua/2017/222

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
P.U. (A)
Status
In force
Enacted
2017
Sections
3

Quick answer

About this p.u. (a)

PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 is Malaysia P.U. (A), cited as P.U. (A) 222 2017, currently marked in force and first recorded in 2017.

Opening note

Preamble

Suggest a correction
  1. PADA menjalankan kuasa yang diberikan oleh seksyen 63 Akta Tenaga Boleh Baharu 2011 [Akta 725], Menteri membuat perintah yang berikut: Nama dan permulaan kuat kuasa

Seksyen 2

Jadual kepada Akta Tenaga Boleh Baharu 2011 dipinda berhubung dengan butiran

Open as pageSuggest a correction

“Fotovolta suria”—

(a)

dengan memasukkan selepas subbutiran (a)(i) dan butir-butir yang berhubungan dengannya subbutiran dan butir-butir yang berikut:

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

Fotovolta suria

Suggest a correction

(a)

Pepasangan tenaga boleh baharu yang mempunyai kapasiti terpasang—

Kadar tarif galakan asas

“(ia) sehingga dan termasuk 4 kilowatt

(individu B40 0.7424

10 tahun 0%”;

P.U. (A) 222 3

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan di bawah

Program

MySuria)

Suggest a correction

(b)

dengan memasukkan selepas subbutiran (b)(i) dan butir-butir yang berhubungan dengannya subbutiran dan butir-butir yang berikut:

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada

Suggest a correction

(a)

di atas—

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

“(ia) penggunaan sebagai pepasangan dalam bangunan atau struktur bangunan

(individu B40

+ 0.1395

10 tahun 0%”;

P.U. (A) 222 4

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan di bawah

Program

MySuria)

Suggest a correction

(c)

dengan memasukkan selepas subbutiran (b)(ii) dan butir-butir yang berhubungan dengannya subbutiran dan butir-butir yang berikut:

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan (dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada

Suggest a correction

(a)

di atas—

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

“(iia) penggunaan sebagai bahan bangunan

(individu B40

di bawah

Program

MySuria)

+ 0.1060 10 tahun 0%”; dan

P.U. (A) 222 5

Suggest a correction

(d)

dengan memasukkan selepas subbutiran (b)(iii) dan butir-butir yang berhubungan dengannya subbutiran dan butir-butir yang berikut:

Ruang

Pertama

Ruang Kedua

Ruang

Ketiga

Ruang

Keempat

Ruang

Kelima

Sumber boleh baharu

Perihalan pepasangan tenaga boleh baharu yang layak

Kadar tarif galakan

(dalam ringgit bagi setiap kilowatt jam)

Tempoh berkuat kuasa

(bermula dari tarikh permulaan kuat kuasa tarif galakan)

Kadar pengurangan tahunan

Suggest a correction

(b)

Pepasangan tenaga boleh baharu yang mempunyai mana-mana satu kriteria atau lebih yang berikut sebagai tambahan kepada

Suggest a correction

(a)

di atas—

Kadar tarif galakan bonus sebagai tambahan kepada kadar tarif galakan asas

“(iiia) penggunaan modul fotovolta suria yang dibuat atau dipasang di Malaysia

(individu B40

di bawah

Program

MySuria)

+ 0.05 10 tahun 0%”.

Dibuat 27 Julai 2017

[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Menteri Tenaga, Teknologi Hijau dan Air

P.U. (A) 222 6

RENEWABLE ENERGY ACT 2011

RENEWABLE ENERGY (AMENDMENT OF SCHEDULE) ORDER 2017

Suggest a correction

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 63 of the Renewable Energy Act 2011 [Act 725], the Minister makes the following order: Citation and commencement 1.

(1)

This order may be cited as the Renewable Energy (Amendment of

Schedule) Order 2017.

Suggest a correction

(2)

This Order comes into operation on 1 August 2017.

Amendment of Schedule 2.

The Schedule to the Renewable Energy Act 2011 is amended in relation to the item

“Solar photovoltaic”—

(a)

by inserting after subitem (a)(i) and the particulars relating to it the following subitem and particulars:

First

Column

Second Column

Third Column

Fourth Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

Solar photovoltaic

Suggest a correction

(a)

Renewable energy installation having an installed capacity—

Basic feed-in tariff

“(ia) up to and including 4 kilowatts individual under MySuria

Programme)

Suggest a correction
Suggest a correction

Seksyen 0

Open as pageSuggest a correction

7424

10 years 0%”;

P.U. (A) 222 7

(b)

by inserting after subitem (b)(i) and the particulars relating to it the following subitem and particulars:

First

Column

Second Column

Third

Column

Fourth Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a)

above—

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

“(ia) use as installations in building or building structures (B40

individual under MySuria

Programme)

+ 0.1395

10 years 0%”;

Suggest a correction

(c)

by inserting after subitem (b)(ii) and the particulars relating to it the following subitem and particulars:

First

Column

Second Column

Third Column

Fourth Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a) above—

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

“(iia) use as building materials individual under MySuria

Programme)

+ 0.1060

10 years 0%”; and

P.U. (A) 222 8

Suggest a correction

(d)

by inserting after subitem (b)(iii) and the particulars relating to it the following subitem and particulars:

First

Column

Second Column

Third

Column

Fourth Column

Fifth

Column

Renewable resources

Description of qualifying renewable energy installation

Feed-in tariff rate

(in ringgit per kilowatt hour)

Effective period

(commencing from the feed-in tariff commencement date)

Annual degression rate

Suggest a correction

(b)

Renewable energy installation having any one or more of the following criteria in addition to (a)

above—

Bonus feed-in tariff rate in addition to basic feed-in tariff rate

“(iiia)

use of solar photovoltaic modules manufactured or assembled in

Malaysia individual under MySuria

Programme)

+ 0.05 10 years 0%”.

Made 27 July 2017

[KeTTHA: (S)100-1/1/5; PN(PU2)693/VI]

DATUK SERI PANGLIMA DR. MAXIMUS JOHNITY ONGKILI

Minister of Energy, Green Technology and Water

Suggest a correction

Common questions

What is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 is Malaysia P.U. (A), cited as P.U. (A) 222 2017, currently marked in force and first recorded in 2017.
Is PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 still in force?
Yes — PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 is currently in force.
When did PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 take effect?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 was first recorded in 2017.
How many sections does PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 have?
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 contains 3 sections.
Where can I read the official version of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017?
The official text of PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 is published at lom.agc.gov.my.
PERINTAH TENAGA BOLEH BAHARU (PINDAAN JADUAL) 2017 (No. 222)