Skip to content

Section 59

Marking of gas pipeline for identification

of Gas Supply Regulations 2023

State Subsidiary LegislationIn forceProvision 59 of 145
Section 59
(1)

A person installing a gas pipeline shall mark the gas pipeline in the manner as prescribed in Figure 4 of the Fourth Schedule so that upon inspection the gas pipeline is identifiable as a gas pipeline for conveying gas.

(2)

The responsible person or his representative shall ensure that the gas pipeline continues to be identifiable as long as it is used for conveying gas.