Section 11

of Sabah Renewable Energy Feed Approval And Feed Tariff Rate Rules 2024

Section 11

(a)

the particulars of the eligible producer;

(b)

a description of the renewable energy installation which shall be owned by the eligible producer, including —

(i)

the renewable resource to be used for the operation of the renewable energy installation;

(ii)

the proposed installed capacity of the renewable energy installation and the capability level of the renewable energy installation to provide renewable energy;

12

(iii)

the proposed location of the renewable energy installation;

(iv)

the proposed feed-in tariff commencement date which where applicable, shall take into account the requirements of the connection confirmation check or power system study conducted in accordance with the Sabah Renewable Energy (Technical and

Operational Requirements) Rules 2024; and

(v)

the proposed milestones and dates by which such milestones are to be achieved;

(c)

the name of the distribution licensee whose electricity distribution network is proposed to be connected to the renewable energy installation;

(d)

the location, details and specifications of the proposed connection between the renewable energy installation and the connection point and, where applicable, accompanied by a copy of the report of the connection confirmation check or power system study conducted in accordance with the Sabah Renewable Energy (Technical and Operational Requirements)

Rules 2024;

(e)

particulars of any feed-in approval currently or previously held by the eligible producer;

(f)

evidence of the eligible producer’s ownership of, or other conditional or unconditional rights to utilize, the site or building on which the renewable energy installation is to be located;

(g)

where the eligible producer applies for any bonus feed-in tariff rate, such documents that are required under subrule 24(1); and

(h)

such other information or document as the Commission may require in writing.

(2)

In the case of an application for a feed-in approval by a company, the application shall be accompanied by the information required under subrule (1) and, where applicable, with the following additional information:

(a)

corporate information of the company including the ultimate beneficial shareholders of the company;

(b)

the audited accounts, memorandum and articles of association or

13

constitution of a company, and a certified copy of documents under sections 17, 46, 58, 68 and 78 of the Companies Act 2016 [Act 777]; and

(c)

the financial model of the company.