Section 8

(a)

utilizes a new type of renewable resource; and

(b)

does not have separate and dedicated interconnection cables and a separate and dedicated revenue meter in respect of the increase in the installed capacity, the feed-in approval holder shall apply for a new feed-in approval in respect of the total combined installed capacity of his or its installation after taking into account such increase in the installed capacity.

(2)

Where a feed-in approval has been granted and the feed-in approval holder proposes to increase the installed capacity of his or its renewable energy installation which —

(a)

utilizes a new type of renewable resource; and

(b)

has separate and dedicated interconnection cables and a separate and dedicated revenue meter in respect of the increase in the installed capacity, the feed-in approval holder shall retain his or its earlier feed-in approval and apply for a separate feed-in approval in respect of such increase in the installed capacity of the installation.

10

(3)

Where a new feed-in approval is granted by the Commission under subrule (1), the feed-in approval holder shall surrender his or its earlier granted feed-in approval to the Commission in accordance with rule 22 on or before the initial operation date of the total combined installed capacity of the installation.

(4)

Upon the surrender of the earlier granted feed-in approval under subrule (3), the earlier granted feed-in approval shall be deemed to have been superseded by the new feed-in approval.