Malaysia legislation
Section 7
of Sabah Renewable Energy Feed Approval And Feed Tariff Rate Rules 2024
Section 7
(a)
utilizes more than one type of renewable resource; and
(b)
does not have separate and dedicated interconnection cables and a separate and dedicated revenue meter in respect of renewable energy generated by each type of the renewable resource, the eligible producer shall only make one application for a feed-in approval in respect of the installation.
9
(2)
Where an eligible producer proposes to develop a renewable energy installation which —
(a)
utilizes more than one type of renewable resource; and
(b)
has separate and dedicated interconnection cables and a separate and dedicated revenue meter in respect of renewable energy generated by each type of the renewable resource, the eligible producer shall apply for a separate feed-in approval in respect of the installed capacity for each part of the renewable energy installation which generates renewable energy utilizing each type of the renewable resource.
Application for feed-in approval for increase in capacity of renewable energy installation utilizing different renewable resource