Section 8

Low voltage indirect connection

of Sabah Renewable Energy Technical And Operational Requirements Rules 2024

State Subsidiary LegislationIn forceProvision 8 of 26
Section 8
(1)

A distribution licensee may connect a low voltage renewable energy installation to a connection point through a low voltage indirect connection if —

(a)

the installation utilizes solar photovoltaic as its renewable resource and the installation is installed in the premises of the feed-in approval holder;

(b)

the distribution licensee’s supply line at the connection point supplies electricity to such premises exclusively for the consumption of the feed-in approval holder who owns such renewable energy installation;

and

(c)

the total net export capacity or rated kWp of installations including the proposed renewable energy installation as specified in the second column of the Second Schedule does not exceed the nominal voltage level of the connection point as specified in the first column of the

Second Schedule.

(2)

Notwithstanding subrule (1), the low voltage indirect connection shall not affect the distributions licensee’s rights as provided under the Electricity Supply

Enactment 2024.