Malaysia legislation

Section 9

of Sabah Renewable Energy Technical And Operational Requirements Rules 2024

Section 9

(2)

If a medium voltage direct connection is required to be carried out under subrule

(1)

, the relevant feed-in approval holder and distribution licensee shall comply with the provisions of the Third Schedule.

High voltage direct connection