SCHEDULE II
PART A
(Subrule 12 (1))
Royalty Rate List
Rate per cubic metre
RM sen 1.
Timber from trees of Class A in Schedule I
Round for Export
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
400.00
Helicopter logging coupes
...
400.00
Non-RIL production
...
400.00
23
Rate per cubic metre
RM sen
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearing and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
…
400.00
Round for processing
(i)
Forest Reserve and Natural Forest Management
Production under Reduced Impact Logging (RIL)
regardless of sizes
Reduced Impact Logging (RIL) Production
...
120.00
Helicopter logging coupes
...
120.00
Non-RIL production
...
120.00
Logging Residues
...
120.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logging residues
...
120.00
Converted
...
240.00
Helicopter logging coupes
...
240.00 2
Timber from trees of Class B in Schedule I
Round for Export
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
300.00
Helicopter logging coupes
...
150.00
Non-RIL production
...
300.00
24
Rate per cubic metre
RM sen
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced Impact
Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
300.00
Logs with diameter between 45 cm to 59 cm
...
250.00
Logs with diameter between 30 cm to 44 cm
...
200.00
Logs with diameter of 29 cm and below
...
150.00
Round for processing
(i)
Forest Reserve and Natural Forest Managemen t Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
100.00
Helicopter logging coupes
...
50.00
Non-RIL Production
...
100.00
Logging residues
...
100.00
(ii)
State Land, Alienated Land, Industrial Tree Plantatio
Clearance and Mosaic Planting area under Reduced Impac
Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
95.00
Logs with diameter between 45 cm to 59 cm
...
80.00
Logs with diameter between 30 cm to 44 cm
...
45.00
Logs with diameter of 29 cm and below
...
35.00
Logging residues
...
95.00
Converted
...
190.00
Helicopter logging coupes
...
190.00
25
Rate per cubic metre
RM sen
3.
Timber from trees of Class C in Schedule I
Round for Export
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
180.00
Helicopter logging coupes
...
90.00
Non-RIL production
...
180.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
180.00
Logs with diameter between 45 cm to 59 cm
...
155.00
Logs with diameter between 30 cm to 44 cm
...
130.00
Logs with diameter of 29 cm and below
...
80.00
Round for processing
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
95.00
Helicopter logging coupes
...
48.00
Non-RIL Production
...
95.00
Logging residues
...
25.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
95.00
26
Rate per cubic metre
RM sen
Logs with diameter between 45 cm to 59 cm
...
80.00
Logs with diameter between 30 cm to 44 cm
...
45.00
Logs with diameter of 29 cm and below
...
35.00
Logging residues
...
25.00
Converted
...
190.00
Helicopter logging coupes
...
95.00 4.
Timber from trees of Class D in Schedule I
Round for Export
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
170.00
Helicopter logging coupes
...
85.00
Non-RIL production
...
170.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
170.00
Logs with diameter between 45 cm to 59 cm
...
140.00
Logs with diameter between 30 cm to 44 cm
...
120.00
Logs with diameter of 29 cm and below
...
70.00
Round for processing
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
95.00
27
Rate per cubic metre
RM sen
Helicopter logging coupes
...
48.00
Non-RIL Production
...
95.00
Logging residues
...
25.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
95.00
Logs with diameter between 45 cm to 59 cm
...
80.00
Logs with diameter between 30 cm to 44 cm
...
45.00
Logs with diameter of 29 cm and below
...
35.00
Logging residues
...
25.00
Converted
...
190.00
Helicopter logging coupes
...
95.00 5.
Timber from trees of Class E in Schedule I
Round for Export
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) production
...
135.00
Helicopter logging coupes
...
68.00
Non-RIL Production
...
135.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
135.00
28
Rate per cubic metre
RM sen
Logs with diameter between 45 cm to 59 cm
...
110.00
Logs with diameter between 30 cm to 44 cm
...
100.00
Logs with diameter of 29 cm and below
...
60.00
Helicopter logging coupes
...
95.00
6.
Timber from trees of Class F in Schedule I
Round for Export
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Round for processing
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
95.00
Helicopter logging coupes
...
48.00
Non-RIL Production
...
95.00
Logging residues
...
25.00
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
95.00
Logs with diameter between 45 cm to 59 cm
...
80.00
Logs with diameter between 30 cm to 44 cm
...
45.00
Logs with diameter of 29 cm and below
...
35.00
Logging residues
...
25.00
Converted
...
190.00
29
Rate per cubic metre
RM sen
Reduced Impact Logging (RIL) Production
...
150.00
Helicopter logging coupes
...
Not applicable
Non-RIL production
...
150.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
150.00
Logs with diameter between 45 cm to 59 cm
...
150.00
Logs with diameter between 30 cm to 44 cm
...
150.00
Logs with diameter of 29 cm and below
...
150.00
Round for processing
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
95.00
Helicopter logging coupes
...
Not applicable
Non-RIL Production
...
95.00
Logging residues
...
25.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
Logs with diameter of 60 cm and above
...
95.00
Logs with diameter between 45 cm to 59 cm
...
80.00
Logs with diameter between 30 cm to 44 cm
...
45.00
Logs with diameter of 29 cm and below
...
35.00
30
Rate per cubic metre
RM sen
Logging residues
...
25.00
Converted
...
190.00
Helicopter logging coupes
...
Not applicable 7.
Timber from trees of Class G in Schedule I
Round for Export
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
20.00
Helicopter logging coupes
...
10.00
Non-RIL Production
...
20.00
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
...
20.00
Round for processing
(i)
Forest Reserve and Natural Forest Management
Production regardless of sizes
Reduced Impact Logging (RIL) Production
...
Not applicable
Helicopter logging coupes
...
Not applicable
Non-RIL Production
...
5.00
Logging residues
...
Not applicable
(ii)
State Land, Alienated Land, Industrial Tree Plantation
Clearance and Mosaic Planting area under Reduced
Impact Logging (RIL) Production regardless of sizes
...
5.00
Logging residues
...
Not applicable
Converted
...
Not applicable
31
Rate per cubic metre
RM sen
Helicopter logging coupes
...
Not applicable 8.
Timber from trees of Class H in Schedule I
Round for Export
(i)
Industrial Tree Plantation (ITP) Forest Reserve and
State Land
Logs with diameter of 60 cm and above
...
60.00
Logs with diameter between 45 cm to 59 cm
...
48.00
Logs with diameter between 30 cm and 44 cm
...
36.00
Logs with diameter of 29 cm and below
...
24.00
(ii)
Alienated Land
Logs with diameter of 60 cm and above
...
5.00
Logs with diameter between 45 cm to 59 cm
...
5.00
Logs with diameter between 30 cm to 44 cm
...
5.00
Logs with diameter of 29 cm and below
...
5.00
Round for processing
(i)
Industrial Tree Plantation (ITP) Forest Reserve and
State Land
Logs with diameter of 60 cm and above
...
30.00
Logs with diameter between 45 cm to 59 cm
...
24.00
Logs with diameter between 30 cm to 44 cm
...
18.00
Logs with diameter of 29 cm and below
...
12.00
(ii)
Alienated Land
Logs with diameter of 60 cm and above
...
Not applicable
32
Rate per cubic metre
RM sen
Logs with diameter between 45 cm to 59 cm
...
Not applicable
Logs with diameter between 30 cm to 44 cm
...
Not applicable
Logs with diameter of 29 cm and below
...
Not applicable 9.
Logs for domestic Pulp and Paper mill:
Type
Rate per cubic metre
RM sen
(i)
Natural Forest Timber irrespective of size and species
...
7.50
(ii)
Plantation Timber irrespective of size and species
...
6.00 10.
Fuelwood as burning material for power generators and brick factories (Forest Reserve (NFM)/Industrial tree Plantation
(ITP) Forest Reserve/State Land and Alienated Land:
RM5/m3.
11.
Sawn and Converted Timber for export
Type
Rate per cubic metre
RM sen
(a)
Belian Sawn Timber
...
120.00
(b)
Other species of Sawn Timber
...
10.00
(c)
All Plywood
...
10.00
(d)
All Veneer
...
10.00
(e)
All Mouldings
...
5.00
(f)
Woodchips (irrespective of source - Forest Reserve,
State Land and Alienated Land)
...
2.50
33
12.
Other timber for domestic use -
Type
Rate
RM sen
(i)
Mangrove trunk or poles of trees regardless of size for piling and charcoal production
...
0.50 per running metre
(ii)
Nibong trunk or poles regardless of size
...
0.50 per running metre
(iii)
Firewood of any species
...
1.00 per stacked m3 1.50 per metric tonne
(iv)
Mangrove charcoal
(a)
any species in bulk
...
10.00 per metric tonne
(b)
raw rattan
...
10% of the selling price 13.
Other timber for Export -
Type
Rate
RM sen
(i)
Woodchips (irrespective of source-Forest
Reserve, State Land and Alienated Land)
...
2.50 per metric tonne
(ii)
Raw rattan (imported and re-exported)
...
10% of the
FOB value
(iii)
Other forest produce
...
10% of the
FOB
14.
Gaharu (Aquilaria malaccensis)
Rate
RM Sen
Type
Local
Export
1)
Round logs a)
Natural Forest (Alienated Land and Industrial Tree Plantation 1,000.00 per m3 2,000.00 per m3
34
(ITP) Forest Reserve)
b)
Planted (Alienated Land)
5.00 per m3 10.00 per m3
c)
Imported and re-exported (with permit from the Management
Authority (MA) of the country of origin)
-
2,000.00 per m3
2)
Converted timber a)
Natural Forest (Alienated Land and Industrial Tree Plantation
(ITP) Forest Reserve)
4,000.00 per m3 8,000.00 per m3
b)
Planted (Alienated Land)
10.00 per m3 20.00 per m3
c)
Imported and re-exported (with permit from the Management
Authority (MA) of the country of origin)
-
8,000.00 per m3
3)
Wood piece and Gaharu blocks with resin a)
Natural Forest (Alienated Land and Industrial Tree Plantation
(ITP) Forest Reserve)
-
10% of the value.
b)
Planted (Alienated Land)
-
10% of the value.
c)
Imported and re-exported (with permit from the Management
Authority (MA) of the country of origin)
-
10% of the value.
4)
Wood chips, fragments, shavings and splinters a)
Natural Forest (Alienated Land and Industrial Tree Plantation
(ITP) Forest Reserve)
-
10% of the value.
b)
Planted (Alienated Land)
-
10% of the value.
c)
Imported and re-exported (with permit from the Management
Authority (MA) of the country of origin)
-
10% of the value.
5)
Sawdust/wood flour a)
Natural Forest (Alienated Land and Industrial Tree Plantation
-
10% of the value.
35
(ITP) Forest Reserve)
b)
Planted (Alienated Land)
-
10% of the value.
c)
Imported and re-exported (with permit from the Management
Authority (MA) of the country of origin)
-
10% of the value.
6)
Gaharu Oil a)
Natural Forest (Alienated Land and Industrial Tree Plantation
(ITP) Forest Reserve)
-
10% of the value.
b)
Planted (Alienated Land)
-
10% of the value.
c)
Imported and re-exported (with permit from the Management
Authority (MA) of the country of origin)
-
100.00/Tola
(12 gram)
7)
Other products not mentioned a)
Natural Forest (Alienated Land and Industrial Tree Plantation
(ITP) Forest Reserve)
-
10% of the value.
b)
Planted (Alienated Land)
-
10% of the value.
c)
Imported and re-exported (with permit from the Management
Authority (MA) of the country of origin)
-
10% of the value.
36
PART B
(Rule 14)
Grading and Marking Fees
(a)
Sawn Timber: - Abolished.
(b)
Logs:
(i)
Marking with mark of Origin “BINOB”
…
0.50
(ii)
Certificate of Grade and marking with mark of Origin “BINOB”
…
1.00
(iii)
Certificate of correct measurement
…
2.00
(iv)
Certificate of Freedom from live borer only
…
1.00
(v)
Certificate of Grades, correct measurement, freedom from live borer and marking
…
3.00
(vi)
Miscellaneous Inspection
…
1.50
PART C
(Rule 19 (1))
Sawmill/Plant Licences Fees
Rate per annum
RM sen
(i)
Sawmill
(a)
for own use
...
3,000.00 and 100.00 for each sawbench
(b)
for commercial use
...
3,000.00 and 100.00 for each sawbench
37
Rate per annum
RM sen
(c)
Government use
...
Exempted from licence and machinery fees
(ii)
Plywood Plant
...
6,000.00 and 2,400.00 for each peeler or slicer and 100.00 for each sawbench
(iii)
Veneer Plant
...
6,000.00 and 2,400.00 for each peeler or slicer and 100.00 for each sawbench
(iv)
Blockboard Plant
...
5,000.00 and 2,400.00 for each peeler or slicer and 100.00 for each sawbench
(v)
Carbon Rod/Briquette Mill
...
1,000.00
(vi)
Chopstick Mill
...
500.00
(vii)
Match Plant
...
100.00
(viii)
Chipmill
...
6,000.00
(ix)
Moulding Plant
...
2,000.00 and 100.00 for each sawbench
(x)
Medium Density Fibreboard Plant (MDF)
(a)
Using timber fibre
...
6,000.00
38
Rate per annum
RM sen
(b)
Using non-timber fibre
...
1,000.00
(xi)
Particleboard Plant
(a)
Using timber fibre
...
6,000.00
(b)
Using non-timber fibre
...
1,000.00
(xii)
Pulp Plant
...
12,000.00
(xiii)
Paper Plant
(a)
Using timber fibre
...
12,000.00
(b)
Using non-timber fibre
...
1,000.00
(xiv)
Wood Preservation Plant
...
1,200.00
(xv)
Wood Cement Board Plant
...
5,000.00
(xvi)
Kiln Dry Plant
...
1,200.00
(xvii)
Furniture Mill
...
2,000.00 and 100.00 for each sawbench
Note:
If a mill is an integral part of another mill then only the highest fees will be imposed. This provision however does not apply to Wood Preservation Plant and Kiln Dry Plant, where a separate licence fees is imposed.
39
PART D
(Rule 20A)
Fees to Occupy Land and/or to Collect/Extract
Forest Produce in/or from Forest Reserve
Rate per hectare per annum
RM sen 1.
Permit to Occupy Forest Reserve:
(a)
for campsite, logging roads and dumping point
…
250.00
(b)
for prospecting purpose
...
1,260.00
and 120.00
for road
(c)
for landings -
(i)
Class I (less than or equal to 0.5 ha)
…
1,000.00
(ii)
Class II (0.51 ha – 1 ha)
…
2,000.00
(iii)
Class III (Greater than 1.00 ha)
…
5,000.00
(d)
for mangrove charcoal factory
...
250.00
(e)
for other uses -
(Gridlines, geothermal, warehouse, telecommunication/
transmission hub, recreation, gravity water source, jetty, sawmill site, aquaculture, non-logging road access, oil and gas pipelines and any other uses
...
250.00
(f)
for quarry -
(i)
Occupation
...
5,000.00
(ii)
Annual fee
(a)
Grade A
...
50,000.00
per annum
40
Rate per hectare per annum
RM sen
(b)
Grade B
...
24,000.00
per annum
(c)
Grade C
...
12,000.00
per annum
(d)
Grade D
...
6,000.00
per annum
(e)
Grade E
...
2,000.00
per annum
(iii)
for removal of sand
...
5,000.00
and 10% of the sand value
(iv)
for removal of gravel stones
...
1,000.00 2.
Permit to:
(i)
Quarry
…
5,000.00
41
PART E
(Rule 20B (2))
Registration Fees for Tractor, Trucks and Other vehicles
Rate per unit per annum
RM sen 1.
Registration of:
(i)
Tractor
…
1,000.00
(ii)
Skidder
…
500.00
(iii)
Others
…
500.00
(iv)
Long Distance Cable System (LDCS)
...
No fees imposed
(v)
Helicopter
...
1,000.00
[G.N.S. 26/2013 c.i.f. 02.07.2012]
PART F
(Rule 17A (2))
Fees for Approving Vessels
Rate per vessel
RM sen
(a)
For destination to one country
(i)
Vessels registered in Malaysia
…
1,000.00
(ii)
Vessels registered outside Malaysia
…
2,000.00
(b)
For destination to every additional country
…
500.00
42