Section 125

When a breach of condition arises

(1)

A breach of a condition requiring continuous performance shall arise so soon, and continue so long, as the condition is not complied with.

(2)

A breach of a condition subject to a fixed term shall arise—

(a)

in the case of a condition requiring the doing of any act within any time (being the time specified therein, or that time as extended under section 107) upon the expiry of that time without the act having been done;

(b)

in the case of a condition requiring any act to be refrained from until any time, upon the doing of that act before that time.