PRELIMINARY
Citation and commencement
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Gas Supply Regulations 2023 is Malaysia State Subsidiary Legislation, cited as State Subsidiary Legislation 2023 2023, currently marked in force and first recorded in 2023.
GAS SUPPLY REGULATIONS 2023
(G.N.S 1 of 2023)
Opening note
Citation and commencement
These regulations may be cited as the Gas Supply Regulations 2023.
In these Regulations, unless the context otherwise requires —
“additional gas installation” means an addition of gas pipeline to an existing gas installation which is not indicated in the drawings of the existing gas installations which have been approved;
“domestic gas installation” means a single gas installation in a private dwelling which is not used as a hotel or boarding house or for the purpose of carrying out any business, trade or profession or for providing any service;
“gas appliance” means an appliance designed for use or to be used by a consumer of gas for heating, burning, motive power or other purposes for which gas can be used and includes a gas appliance regulator;
“Gas Contractor” means a person who holds a Certificate of Registration as a Gas Contractor issued under regulation 100;
11
“Gas Engineer” means a person who holds a Certificate of Competency as a Gas Engineer issued under regulation 94;
“Gas Engineering Supervisor” means a person who holds a Certificate of
Competency as a Gas Engineering Supervisor issued under regulation 95;
“gas equipment” means a functioning item such as a valve or pressure regulator used in a gas system;
“Gas Fitter” means a person who holds a Certificate of Competency as a
Gas Fitter, with or without restrictions, issued under regulation 97;
“gas fitting” means an item in a piping or tubing system that is used as a connector such as an elbow, a return bend, tee, a union, a bushing, coupling, cross or nipple but does not include a functioning item such as a valve or pressure regulator;
“gas main pipe” means a pipe installed in a community to convey gas to an individual service pipeline or other main pipe;
“gas service pipe” means the pipe between the gas main pipe and a meter installed on the premises of a consumer and includes any pipe downstream of a service isolation valve;
“meter” means a device installed to measure, ascertain or regulate the amount of gas taken or used from the main supply;
“operating pressure” means the pressure of gas at which a gas system is operated;
“person” includes a firm, a company, an association, a partnership (whether or not having a separate legal personality), or a body of persons (whether incorporated or not);
“purge” means the removal of all air and gas other than the gas supplied from a gas service pipe, meter, gas equipment or gas appliance;
“regulator” means a device used for regulating gas pressure;
“responsible person”, in relation to any premises, means the licensee or consumer, or an occupier of the premises, or where there is no consumer or occupier, the owner of the premises or any person authorized by the consumer or occupier to
12
be in charge of the gas pipeline or gas installation in the premises;
“service isolation valve” means a valve installed at or near the boundary line of a property or at the apron of a building for the purpose of controlling or shutting off gas flow;
“valve” means a device used for the purpose of controlling or shutting off gas flow and includes a service isolation valve;
“work”, in relation to a gas pipeline or gas installation, means the following work:
constructing, testing, fixing, operating, maintaining, servicing, adjusting, repairing, altering or renewing a gas pipeline or gas installation or the purging of air or gas in the gas pipeline;
Scope of application
These Regulations shall apply in relation to —
For the purposes of these Regulations, a reference to the installation of a gas pipeline includes a reference to the conversion of a pipe, fitting, meter, equipment, apparatus or appliance in order to use the gas supplied through the pipeline.
13
Categories of licence
The licence granted under section 4 of the Enactment shall be categorised as follows —
Application for licence
A person applying for a licence to carry out any activity under section 4 of the Enactment shall submit the application to the Commission together with the details as specified in section 5 of the Enactment.
The application under subregulation (1) shall be in Form A as prescribed in the First Schedule.
Fee for licence
The person issued with a licence shall pay the fee at the rate as prescribed in
Part I of the Third Schedule.
Renewal of licence
An application for the renewal of a licence shall be made —
14
in the case of an import of gas licence, a regasification licence, a shipping licence, a transportation licence or a distribution licence, at the time as specified in the licence; and
in the case of a private gas licence or retail licence, in not less than two months before the date of expiry of the licence.
The application for renewal of a licence under paragraph (1)(c) may be approved by the Commission after an inspection and test of the gas installation has been carried out, but the Commission may, in its discretion, renew the licence without any inspection or test.
For the purpose of subregulation (2), the licence shall be valid for a period of twelve months from the date of renewal.
Suspension or revocation of licence
A licence issued under these Regulations may be suspended or revoked by the Commission if —
the holder of the licence has failed to comply with these Regulations or any codes issued under the Enactment; or
the licence was granted based on the submission of false, incorrect or misleading information.
Upon the revocation of a licence under subregulation (1), the holder of the licence shall, within fourteen days from the date he is notified in writing of the revocation, surrender the licence to the Commission.
Upon the suspension of a licence under subsection 10(1) of the
Enactment, the holder of a licence shall, within fourteen days from the date he is notified in writing of the suspension, surrender the licence to the Commission.
15
Duty of distribution, retail and private gas licensee to keep and maintain record
A distribution, retail and private gas licensee shall keep and maintain a proper record of all installations for the inspection and approval of the Commission.
The record shall contain the following details:
, a distribution, retail or private gas licensee shall keep and maintain the following records and produce them within the specified time when required to do so by the Commission —
the number of breakdown of installations and accidents involving distribution pipelines or piping system, as the case may be;
Classification of gas installation
All gas installations shall be classified in accordance with the classes as specified in Table 1 of the Second Schedule.
16
Installation to be carried out in accordance with Regulations
Every work on a gas installation shall be carried out in accordance with these
Regulations and any condition as may be determined by the Commission.
Approval to install
Before commencing work on any new installation, additional gas installation or extension of gas installation, a person shall apply to the Commission for an approval to install and shall attach the drawings of the system properly engineered to a suitable scale or in isometric projection showing all the details of the gas installation.
The drawings referred to in subregulation (1) shall be endorsed by a Gas
Engineer, Gas Engineering Supervisor, Class I Gas Fitter or Class II Gas Fitter, as the case may be.
The Commission may approve the application if the Commission is satisfied that the application has met the requirements of these Regulations.
All the terms and conditions of the approval to install shall be complied with by —
the competent person engaged to advice on the work on the installation, to the extent of his scope of work; and
the Gas Contractor registered with the Commission, carrying out the work on the installation, as contained in an approval to install issued by the Commission pursuant to subregulation (3).
The fee payable for processing the application for and the issuance of the approval to install is as prescribed in Part I of the Third Schedule.
Approval to operate
Upon completion of a new gas installation, additional gas installation or extension of gas installation work, the applicant shall apply for an approval
17
to operate it from the Commission by submitting a written application together with a Certificate of Completion issued under regulation 14 and a Test Certificate issued under regulation 15.
The Commission may approve the application if it is satisfied that the applicant has fulfilled the requirements of these Regulations and subsequently issue an approval to operate, containing such terms and conditions as it deems fit.
The fee payable for processing the application for and the issuance of the approval to operate is as prescribed in Part I of the Third Schedule.
Certificate of Completion
The Certificate of Completion referred to in regulation 13 shall be in Form B as prescribed in the First Schedule and shall be issued and signed by the appropriate competent person who supervises the installation work as specified in Table 2 of the Second Schedule.
Test Certificate
Before gas is supplied to a new gas installation or an additional gas installation, the new gas installation or the additional gas installation shall be tested and certified to be safe from leakage by the appropriate competent person as specified in Table 2 of the Second Schedule.
Upon carrying out the test under subregulation (1), the competent person shall issue a Test Certificate which shall be in Form C as prescribed in the First Schedule.
Notification of an existing gas installation work
No person shall commence any work on an existing gas installation without first notifying the Commission or the licensee, as the case may be.
The notification under subregulation (1) shall be in Form D as set out in the
First Schedule.
18
The Commission may order work to be suspended or stopped
Where a person fails to comply with regulation 16, the Commission may order the work on the gas installation to be suspended or stopped.
Supervision of work on gas installation by competent person
Every work on a gas installation shall be supervised by a competent person employed by the Gas Contractor who is carrying out the installation work.
The Commission or licensee to determine point of termination
The point of termination of the gas main pipe, gas service pipe and riser in premises supplied with gas shall be determined by the Commission or the licensee, as the case may be.
Inspection and Test
The Commission may inspect and test gas installation
The Commission may inspect and test a gas installation after giving notice of the intention to inspect and test as prescribed in Form E of the First Schedule.
The notice under subregulation (1) shall be served either personally or by registered post or may be affixed at a conspicuous place of the premises where the gas installation which is to be inspected and tested is located.
The notice under subregulation (1) shall be valid for a period not exceeding twenty-one days from the date of issue.
Upon receipt of the notice under subregulation (1) the responsible person shall make or cause to be made the necessary preparation for the carrying out of the inspection and test and shall be present at the time of the inspection and test.
Fee for inspection and test of gas installation
The fee as prescribed in Part I of the Third Schedule shall be charged for the inspection and test of the gas installation.
19
Information, Excavation and Safety of Gas Installation
Location of gas installation
The location of a gas installation shall be indicated in accordance with one or more of the following methods:
provision of a plan on or listing of facility locations by measurement from a surface datums point;
For the purpose of subregulation (1) the concrete marker, warning sign post and pipeline marker for a traffic area shall be as prescribed in Figure 1, 2 or 3
respectively, of the Fourth Schedule.
Area around indicated location
A prelocated or marked gas installation shall be considered to lie within a zone equal to the diameter of the gas installation plus 0.5 metres on either side of the indicated location.
Installation in vicinity of underground structure
Except where permitted in writing by the Commission, no person shall install or construct an underground structure that interferes with a gas installation by passing over, under or enclosing the gas installation until an agreement has been entered into with the licensee for the removal or alteration of the gas installation.
Notice to licensee
A person who intends to construct an underground structure within one meter
20
of a gas installation shall notify the licensee operating in the area or his agent in writing in not less than three working days before commencing excavation for the structure.
Request for information from licensee or agent on location of gas installation
A person who intends to excavate shall, in not less than four working days prior to the day of the proposed excavation, request in writing from the licensee or his agent who is operating in the area for an information on the location of the underground gas installation in the vicinity of the proposed excavation.
Information from licensee or agent on location of gas installation
Upon a request made under regulation 26, the licensee or his agent shall indicate the location of the gas installation owned, operated or registered by the licensee or his agent in the area where the excavation is intended to be made.
The licensee or his agent shall provide the information requested under subregulation (1) twenty-four hours prior to the day of the proposed excavation.
Not to commence excavation work until information is received
No person shall commence an excavation work until he ascertains that —
the information on the location of gas installation under regulation 27 has been given.
Duty to notify licensee on intention to excavate
Where a person who intends to carry out excavation work is aware that a gas installation is in the vicinity of the proposed place of excavation, he shall notify the licensee or his agent in the area in not less than three working days before commencing excavation.
21
Supervision on excavation work
Excavation work in the vicinity of a gas installation shall be carried out under the supervision of the relevant competent person in accordance with the class of the gas installation.
Hand digging to confirm location
The indicated location of a gas installation shall be confirmed by the excavator by means of hand digging and he shall expose the gas installation at a sufficient number of locations to determine its exact position and depth before using mechanised excavation equipment for any purpose other than breaking the surface cover.
Probing with pointed tools prohibited
No person shall probe into the earth by using pointed tools in order to locate a gas installation.
Gas installation not within the zone prescribed
Where an excavator finds that the gas installation is not within the zone prescribed under regulation 23, he shall so notify the licensee or his agent of that fact.
The licensee or his agent shall, upon being notified under subregulation (1), assist the excavator to locate and expose the gas installation and shall prohibit mechanised excavation to be carried out in the vicinity until the gas installation has been located and exposed.
Non-metallic gas installation without tracer wire
In a case where the existing gas installation of non-metallic material is not provided with tracer wires, the licensee or his agent shall, upon request, indicate or cause to be indicated the location of the gas installation including all changes in the direction by using stakes or paint or both at intervals of not exceeding 100 metres and regulation 31 shall apply.
22
Excavator shall maintain markings
It shall not be the responsibility of the excavator, as the work progresses, to maintain and keep visible the markings placed by the licensee or his agent to identify the location of the gas installation.
Where the maintenance under subregulation (1) is not feasible, the excavator shall make other arrangements to ensure that the location of the gas installation is otherwise noticeable by a person.
Prohibition on excavation work which is damaging to gas installation
No person shall carry out an excavation work or cause an excavation work to be carried out in a manner which is damaging or dangerous to a gas installation.
Blasting
A person who intends to blast in the vicinity of a gas installation shall comply with provisions of regulations 25 to 35 and shall, in addition, notify the relevant licensee or his agent in writing of his intention to blast in not less than three working days prior to the blasting.
Where a person, whilst in the process of construction, discovers that blasting is required, he shall submit a notice in writing to the Commission in not less one working day before carrying out the blasting.
Verification of information
Where an excavation work is not commenced within ten days from the date the information under regulation 27 is given by the licensee, the excavator shall verify the information with the licensee or his agent before commencing excavation.
Emergency excavations
Regulations 24 to 37 shall not apply to an emergency excavation where there
23
may be imminent danger to life, health or property provided that verbal notice of the excavation is given to the relevant licensee or its agent as soon as is practicable, and the notice shall subsequently be reduced into writing.
Power of authorized officer to stop excavation
An authorized officer may at any time order a person to stop excavating near a gas installation if he considers that the excavation may damage the gas installation or cause the leakage of gas.
The authorized officer may require a licensee, installer or the owner of a gas installation to cut out or repair a gas pipeline, whether metallic or non-metallic, which is considered to be faulty.
Notification of damage
Any person who causes damage to a gas installation shall, whether or not gas is leaking from the installation, immediately notify the Commission or the licensee, as case may be, of the damage.
Steps to be taken when gas leaks
Any person who causes damage to a gas installation which results in the leakage of gas shall immediately take reasonable steps to —
notify the persons in the premises or near the premises that may be affected by the leakage;
warn all persons in the building which is near to the place where the leakage occurs and where gas odour is present to evacuate the building;
extinguish all flames and sources of ignition in the vicinity of the gas installation;
warn the traffic, vehicles or pedestrian in the vicinity not to enter the area which has been rendered hazardous by the leakage.
Exposure of installation
A person who exposes a gas installation for more than 3 metres whilst carrying out an excavation work shall immediately notify the Commission or the licensee, as the case may be, and shall after that support the gas installation securely on its original line and grade at the intervals of not more than 3 metres to the satisfaction of the Commission or the licensee.
Exposure of fittings
A person who exposes a bell-and-spigot joint, mechanical coupling, valve or line insulator whilst carrying out an excavation work shall —
immediately notify the Commission or the licensee, as the case may be, of the exposed fitting; and
support the exposed fitting adequately to the satisfaction of the Commission or the licensee to ensure that no strain is caused to the gas installation.
Cathodic protection devices
A person working in the vicinity of a gas installation shall take all necessary precautions to ensure that no damage is done to insulators, test wires, sacrificial anodes, anodes beds, rectifier wires and other cathodic protection devices.
Where damage is done to a cathodic protection device the person causing the damage shall report the damage to the Commission or the licensee, as soon as possible.
Damage to protective wrapping
A person who damages the protective wrapping on a gas installation shall —
rectify the damage by rewrapping the gas installation in accordance with
25
the manner as may determined by the Commission but the rewrapped gas installation shall not be backfilled until authorized by the Commission or the licensee.
Backfilling
A person who is backfilling an excavation which exposed a gas installation shall —
take precaution so as not to damage the gas installation, its protective wrapping or a cathodic protection device;
support the gas installation adequately to the satisfaction of the Commission or the licensee to ensure that it will remain in its original line and grade during the backfilling; and
ensure that the backfilling will not diminish the lateral support of an unexposed gas installation.
Gas pipeline to be above ground level when entering building
Except where circumstances render it impracticable, a service gas pipeline shall be installed above the ground level before the pipeline enters a building or structure.
No work on a gas installation until gas is turned off
No person shall install or alter a gas installation where there is a possibility of leakage of gas unless the gas is turned off to eliminate hazards caused by a leakage of gas.
Turning on and turning off supply
Except for emergency purposes, no person shall turn off the gas supply unless all affected consumers are notified.
Where the supply has been turned off, no person shall turn it on again until
26
he notifies all the affected consumers of his intention and carefully checks all the outlet and pilots to ascertain whether the supply is turned on or turned off.
Rented premises
The owner of rented premises shall —
display a notice on the safe operation of a gas appliance on the premises in a place which is noticeable to a tenant, an occupier or other person using the gas appliance; and
Odorization
A gas which does not naturally possess a distinctive odour shall have an odourant added to it so that its presence in the atmosphere is readily detectable at a gas concentration of 1/5 of the lower explosive limit or above.
Subregulation (1) does not apply to any gas delivered for further processing or where the odourant would not act as a warning agent.
Installation of gas pipeline, etc.
Every installation of a gas pipeline shall be made in accordance with these
Regulations and in a manner as may be determined by the Commission.
No person shall install a gas pipeline, gas fitting or gas equipment in a place where it is likely to be exposed to a substance which may corrode the gas pipeline, gas fitting or gas equipment unless the gas pipeline, gas fitting or gas equipment is constructed from materials resistant to being corroded or it is suitably protected against being so corroded.
Protection against damage to gas pipeline, etc.
A person installing a gas pipeline, gas fitting or gas equipment shall ensure that every part of the gas pipeline, gas fitting or gas equipment is supported and protected from damage.
27
Alteration or work on premises not to affect existing gas pipeline
No alteration shall be made on premises which have a gas installation unless it is made in accordance with these Regulations and in the manner as may be determined by the Commission.
No person shall carry out work which would affect a gas pipeline or vent where the use of the gas pipeline may cause danger to a person or property.
Not to use gas pipeline for earth connection, etc.
No person shall use a gas pipeline or any part of a gas installation for earth connection or as an electrical earth-continuity conductor.
Installation of new gas installation
A person who is installing a new gas installation shall ensure that the gas installation is tested for gas tightness.
Upon compliance with subregulation (1), the person shall carry out purging by using an inert gas throughout the entire gas installation in order to remove all air or other gas mixture.
If the gas installation is not to be used at once it shall be sealed off at every outlet with the appropriate fitting.
A loose connection in a gas installation used in the purging procedure and seal after the purging procedure shall be retightened and shall be retested for gas tightness.
Upon the commissioning of the gas installation, the gas to be supplied through the installation shall be conveyed into the entire gas installation to remove all the inert gas present in the gas pipeline.
Work on existing gas installation
Before any work is carried out on an existing gas installation, the person intended to carry out the work shall —
28
submit the work procedure approved by the competent person to the
Commission or the licensee, as the case may be, for final approval;
cordon the affected area and cause a reasonable number of notices displaying the words “GAS WORK IN PROGRESS” and “NO
SMOKING” to be placed in conspicuous positions in the cordoned area;
have a reasonable number of suitable fire extinguishers ready to be used in the work area;
purge gas from the affected part of the gas installation and ensure that no gas remains in the installation and the surrounding area.
After complying with subregulation (1) a person who is carrying out work in relation to an existing gas installation shall ensure that —
the work is carried out in accordance with the work procedure that has been approved; and
After the work has been carried out, the person installing the gas installation shall —
Marking of gas pipeline for identification
A person installing a gas pipeline shall mark the gas pipeline in the manner as prescribed in Figure 4 of the Fourth Schedule so that upon inspection the gas pipeline is identifiable as a gas pipeline for conveying gas.
The responsible person or his representative shall ensure that the gas pipeline continues to be identifiable as long as it is used for conveying gas.
Duties of responsible person or his representative where there is an escape of gas
If the responsible person or his representative knows or has reason to suspect that gas is escaping into the premises, he shall immediately take all reasonable steps to cause the supply of gas to be shut off at the necessary place to prevent further escape of gas.
If gas continues to escape into the premises after the supply of gas has been shut off or when a smell of gas persists, the responsible person or his representative who discovers the escape or smell shall immediately inform or cause to be informed the Commission or the licensee of the escape or smell.
Shutting off gas supply for safety reasons
Where the supply of gas is shut off in any premises for safety reasons, it shall not be restored until all necessary steps are taken by the responsible person or his representative to ensure that gas can be resupplied without causing danger to a person or property.
Rectification work on the supply of gas shall be carried out by a competent person or any other person with the supervision of a competent person.
30
Connection for the Supply of Gas to Consumer
Requirements to be complied with before connection
No gas shall be taken from the gas main pipe until —
an agreement or a special agreement for the supply of gas has been entered into between the parties;
the gas installation connected to the gas main pipe has been inspected, tested and found to be safe by a competent person registered with the
Commission; and
all expenses payable under the Enactment or these Regulations in respect of the supply of gas or gas installation have been paid.
Security
The licensee may require a consumer to deposit a reasonable amount of security within seven days from the date of notice of demand issued by the licensee, which sum shall be sufficient to cover the estimated charges for not more than two months’ supply of gas and two months’ rental of gas pipeline or gas installation, if any, and the amount of security may be altered with the approval of the
Commission.
The security shall not constitute a payment in advance and shall not relieve the consumer from any liability under regulation 66.
Where the supply of gas to the consumer’s gas installation has been disconnected due to the consumer’s failure to make payment of the amount due as stated in the gas bill, the licensee may deduct from the security the amount of the bill together with the charges for gas supplied and rental of gas pipeline or gas installation, if any, from the date of such bill to the date of disconnection of the consumer’s gas installation.
31
Refund of security
The licensee shall refund to the consumer the full amount of security which has been deposited by the consumer in compliance with regulation 63 provided that —
the consumer has vacated the premises and all the accrued charges have been paid in accordance with regulation 68; or
the supply of gas to the consumer has been stopped or disconnected and all accrued charges have been paid.
The refund shall be made to the consumer within a period of two months after the date of the vacation of the premises or the date the supply of gas has been stopped or disconnected.
Recovery of charges
The licensee may recover from a consumer the charges due to him in respect of the supply of gas or in respect of the supply and fixing of a gas meter, gas pipeline or gas equipment.
Gas supply and reconnection fees
A fee for the supply of gas by the licensee shall be charged to the consumer and a bill shall be sent to the consumer monthly and shall be paid within twenty-one working days from the date of the invoice.
In default of the payment of the amount charged under subregulation (1) the licensee may disconnect the supply of gas without further notice.
The licensee shall be entitled to impose a reconnection fee as approved by the Commission, which shall be paid in advance, for the reconnection of the gas installation to the licensee’s gas pipeline.
The bill referred to in subregulation (1) shall contain the amount charged and the requirements under subregulations 68(1) and (2).
32
Restoration of gas supply
The licensee shall restore the supply of gas which has been disconnected under subregulation 66(2) within two working days from the date the following conditions are satisfied:
the consumer has given the security stipulated in subsection 20(1) of the Enactment and subregulation 63(1).
Notice to vacate premises and payment of accrued charges
The consumer shall send a notice to vacate his premises in not less than three working days before the vacation to the licensee in the form as may be determined by the licensee.
If a consumer vacates his premises which are supplied with gas by a licensee without giving the notice under subregulation (1) he shall be liable to pay the licensee all the charges in respect of the supply of gas to the premises accruing up to —
the day from which a subsequent occupier of the premises requires the licensee to supply gas to the premises, as the case may be.
If a consumer vacates his premises without paying the amount due by way of charges in respect of the supply of gas, the licensee may refuse to supply gas to the consumer at any other premises until full payment is made.
The licensee shall not be entitled to recover payment of the amount referred to under subregulation (3) from the subsequent occupier of the premises.
If a consumer vacates his premises without paying the money due in respect of the supply of gas by the licensee or in respect of the supply and fixing of a meter, gas pipeline or gas equipment within a period of ten working days from the date of
33
the demand in writing by the licensee for the payment of the money, the licensee may —
cease the supply of gas to the premises, or to any other premises occupied by the consumer, by the appropriate means as he thinks fit;
and
Power of authorized officer to disconnect the supply of gas and refusal to connect
The authorized officer shall immediately disconnect the supply of gas upon knowing or upon being informed that a gas installation is unsafe for use.
The authorized officer may refuse to connect a gas installation or any of it to the gas main pipe if, in his opinion, the installation or any part of it is unsafe for use or does not comply with these Regulations.
Power of licensee to disconnect
Where a gas installation is connected to the licensee’s gas main pipe, or the replacement of, addition or alteration to a gas installation is made, in contravention of the Enactment or these Regulations, the licensee may, upon giving not less than twenty-four hours notice to the consumer, disconnect the supply of gas from the gas installation.
Inspection and Test of Gas Installation
Entry into premises to inspect, etc., gas installation, etc.
A person authorized by a licensee may, at all reasonable times, on the production of a duly authenticated document of his authority, enter into premises which are supplied with gas by the licensee or by another licensee (whether wholly or partly)
through the first-mentioned licensee’s gas pipeline or gas installation, for any of the following purposes:
Entry to disconnect, etc., supply of gas, etc.
A person authorized by a licensee may, at all reasonable times, on the production of a duly authenticated document of his authority, enter into premises which are supplied with gas by the licensee or by another licensee (whether wholly or partly) through the first-mentioned licensee’s gas pipeline or gas installation, for the purpose of disconnecting the supply of gas or removing a gas fitting, gas pipeline or meter in the premises but shall be subject to the following conditions:
the entry is made in order to cut off or discontinue the supply of gas to the premises as authorized under the Enactment;
the entry is made on order to remove the meter in respect of which an offence has been committed under the Enactment or the regulations made thereunder;
the person who enters into occupation of the premises which were previously supplied with gas does not require the supply of gas; or
the person who enters into occupation of the premises which were previously supplied with gas through a meter belonging to a licensee will not rent or borrow the meter.
Entry for replacing, etc., gas pipeline or gas installation
A person authorized by the licensee may at all reasonable times, on the production of a duly authenticated document of his authority, enter into premises after giving notice of not less than three working days to the consumer or occupier of the premises, or to the owner of the premises which are unoccupied for the purpose of —
placing a new gas pipeline, gas fitting, gas equipment or meter in place of or in addition to an existing gas pipeline, gas fitting, gas equipment or meter which has already been lawfully placed; or
In the case of an emergency arising from fault in a gas pipeline or gas installation, entry under subregulation (1) may be made without giving notice.
35
Powers of entry
A person authorized by a licensee to enter any premises shall ensure that the premises are left secured after the entry.
The licensee shall make good, or pay compensation for, any damage caused by the person so authorized or by the person accompanying him in entering the premises.
A person authorized by a licensee to enter any premises may be accompanied by such persons as may be appropriate for the purpose for which the entry is made.
Fixing of meter, changing of meter position and loss of or damage to meter
For the purposes of section 23 of the Enactment, the licensee shall provide and fix a meter as it considers necessary in order to measure the amount of gas supplied to a consumer.
Where an additional meter is installed by the licensee at the request of the consumer, the consumer shall pay the charges at the rate which is approved by the Commission.
The licensee may change a meter or its position in the premises in which gas is supplied by him.
The consumer shall be liable to indemnify the licensee for the loss of or damage to a meter installed within his premises.
Reading of meter
The reading of a meter shall be prima facie evidence of the amount of gas consumed by the consumer.
However, if —
the supply of gas registered by the meter at any time is not equal to the gas consumed; or
the meter is not registering the actual consumption due to a defect in the installation, the licensee may impose a provisional charge for the gas supplied.
36
If the licensee is unable to provide a meter for a gas installation due to the shortage of a supply of a meter, the licensee may, with the approval of the
Commission, fix a monthly charge for the supply of gas.
Test of meter
The licensee shall have the meter tested upon request in writing by the consumer and upon tendering the fee as may be determined by the licensee.
The test under subregulation (1) shall be made by the licensee as soon as practicable upon receipt of the request and upon payment of the fee to the licensee and the consumer may be present during the test.
If —
the gas meter is found to be registering the consumption of gas when no gas is flowing, the fee shall be refunded and the consumer’s account shall be adjusted.
The adjustment under subregulation (3) shall be limited to the bill rendered for the month prior to the month in which the consumer requested a test of the meter and to the consumer’s account from the date of the last bill to the date of removal of the meter for testing but the licensee may, if he considers special circumstances justify such a course, authorize adjustment of the bill rendered prior to the period stipulated in this subregulation.
In the case where the licensee finds that the gas meter is not registering correctly, the consumer’s account shall be adjusted as in subregulation (4).
Certificate of Competency
37
Competent person to carry out work on gas pipeline, etc.
No person shall engage in or be employed in any work on a gas pipeline or gas installation unless he holds a Certificate of Competency issued under these
Regulations or he works under the control of a competent person.
Competent person shall possess a valid Certificate of Competency
A competent person referred to in these Regulations shall hold a valid Certificate of Competency according to the appropriate category, with or without restriction, issued by the Commission under these Regulations.
Certificate of Competency and scope of work of competent person
The Certificate of Competency as a Gas Engineer, Gas Engineering
Supervisor and Gas Fitter of Class I, Class II and Class III, shall be signed by the
Commission and shall be as prescribed in Forms F and G of the First Schedule, as the case may be.
A Certificate of Competency shall entitle the holder to —
The scope of work of a competent person is as prescribed in Table 2 of the
Second Schedule.
Medical evidence of fitness
The Commission may require medical evidence of physical and mental fitness, certified by a registered medical practitioner, to be produced by a person before a
Certificate of Competency is issued or before registration or renewal of registration is made.
38
Power of the Commission to modify, suspend or cancel a Certificate of
Competency
The Commission may, if it thinks fit, modify, suspend or cancel a Certificate of
Competency issued under these Regulations if the holder of the Certificate obtains the Certificate by making or causing to be made a false or fraudulent declaration, certification or representation, either in writing or otherwise.
Modification, suspension or cancellation of Certificate of Competency
Notwithstanding regulation 82, the Commission may, in its discretion, modify, suspend or cancel a Certificate of Competency issued under these Regulations in the case of serious misconduct by the holder of the Certificate of Competency or where an offence has been committed under the Enactment or these Regulations.
For the purpose of subregulation (1), “serious misconduct” means one or more of the following:
making or causing to be made a false or fraudulent declaration, certification or representation, either in writing or otherwise; and
When an authorized officer has reason to believe that a person who holds a
Certificate of Competency has committed an offence under the Enactment or these
Regulations or any serious misconduct under these Regulations and is no longer fit to hold the Certificate of Competency, he shall forthwith suspend the Certificate and shall refer the matter within seven days from the date of suspension to the
Commission.
39
Upon receipt of the matter referred to him under subregulation (3), the
Commission shall, within seven days, appoint a Committee consisting of the
Chairman as his representative and two other authorized officers to be nominated by the Commission to enquire into the alleged offence or misconduct referred by the authorized officer.
The alleged offender shall be given the opportunity to defend himself against such alleged offence or misconduct before the Committee.
The Committee shall, within fourteen days, forward its findings and recommendations to the Commission who shall decide whether to modify or to suspend for any period of time or to cancel the Certificate of Competency.
A person who is aggrieved by the decision of the Commission under subregulation (6) may apply to the Minister for a reconsideration of the matter.
The application under subregulation (7) shall be made in writing within twenty-one days from the date of the decision of the Commission and shall contain the grounds of grievance.
Person not to work, etc., when Certificate of Competency is suspended or cancelled
A person, whose Certificate of Competency has been suspended or cancelled, as the case may be, shall not, during the period of the suspension or upon cancellation, do any work or act which a holder of a Certificate of Competency is allowed to do.
Loss or damage of Certificate of Competency
If a Certificate of Competency issued by the Commission is lost, stolen, destroyed, mutilated or defaced, a replacement of the Certificate may be issued by the Commission on production of a statutory declaration by the holder that the original Certificate has been lost, stolen or destroyed or upon surrender of the mutilated or defaced original Certificate.
The fee for replacement of Certificate of Competency is as prescribed in Part
II of the Third Schedule.
40
Registration of Competent Person
Registration of competent person
A person who holds a Certificate of Competency and who does work or any act in relation to the Certificate shall be registered with the Commission, in the manner as the Commission may determine.
The registration under subregulation (1) shall be valid for a period of twelve months and shall be renewed annually subject to the payment of fees as prescribed in Part II of the Third Schedule.
A person who holds a Certificate of Competency shall not do any work or act which a holder of a Certificate of Competency is allowed to do if he is more than 65 years of age.
Notwithstanding subregulation (3), the age limit of a person may be waived on a year to year basis at the discretion of the Commission who may require medical evidence of fitness of the person to be certified by a registered medical practitioner.
Examination of Competent Person
Panel of Examiners
For the purpose of this Part, there shall be appointed a Panel of Examiners
(“the Panel”) consisting of a Chairman, a Deputy Chairman and persons as may be appointed under regulation 88.
The Panel shall hold examination referred to in regulation 89 and may recommend to the Commission the issuance of the Certificate of Competency to candidates who have passed the examinations.
Any matter referred to the Panel shall be considered and decided by the
Chairman and at least one member of the Panel.
Notwithstanding subregulation (1), (2) or (3) the Chairman may permit one member of the Panel to conduct the examination of a Gas Fitter.
41
Appointment of members of the Panel
The Commission shall appoint any member of the Commission as
Chairman of the Panel.
The Chairman of the Panel shall appoint —
The Commission may appoint a senior engineer from a relevant Government
Department to be a member of the Panel.
The members of the Panel shall hold office for a term as may be determined by the Commission.
Examinations
The Panel shall hold the following examinations:
A Certificate of Competency awarded to a successful candidate of the examinations in subregulation (1) shall be in Forms F and G as prescribed in the
First Schedule.
The Certificate of Competency shall remain valid until suspended or cancelled under the Enactment or these Regulations.
A holder of a Certificate of Competency shall surrender the Certificate to the
Commission for cancellation upon the issuance of a Certificate of Competency of a higher grade for the same category of work.
42
Conduct of examination
An examination shall be conducted in accordance with the directions given by the Commission.
Fee for examination for Certificate of Competency
The processing fee for an application for examination and the fee for an examination for a Certificate of Competency shall be as prescribed in Part II of the
Third Schedule.
Application to sit for examination
Any application to sit for an examination shall be made in writing in the manner as may be determined by the Panel.
An application under subregulation (1) shall be considered by the Panel who shall decide whether or not the applicant is eligible to sit for the examination and the Panel shall notify the applicant of its decision.
Failure in examination
Where a candidate fails in an examination, the Panel may, in its discretion, refuse to grant permission to the candidate to sit for the examination again until the expiry of a period not exceeding six months as the Panel may deem appropriate.
Certificate of Competency as a Gas Engineer And Gas Engineering Supervisor
Eligibility to become a Gas Engineer
In order to be considered eligible to sit for the examination for a Certificate of Competency as a Gas Engineer, a person shall satisfy the Panel that he complies with the following conditions:
that he holds a degree or qualification equivalent to a degree in gas,
43
mechanical, civil, chemical, petroleum, fuel, electrical, mining, industrial or production engineering from a recognised university or institution or any engineering degree recognised by the Commission;
that he is a Professional Engineer registered with the Board of
Engineers under the Registration of Engineers Act 1967;
that he has not less than two years working experience in gas pipeline or gas installation work;
Before a Certificate of Competency as a Gas Engineer is issued to a person, he shall satisfy the Panel —
that he has sufficient knowledge of gas engineering practices including the principles of operation of the equipment used for production, transmission, distribution, utilisation, metering and maintenance of a gas pipeline or gas installation; and
that he has sufficient knowledge of the Enactment and the regulations made thereunder.
The examination for a Certificate of Competency as a Gas Engineer shall be based on a syllabus to be determined by the Panel and shall be partly by written answers to questions set and partly by viva voce.
Notwithstanding subregulation (1) or (3), the Panel may, in its discretion, exempt a person from any or all of the requirements necessary for the examination.
Eligibility to become a Gas Engineering Supervisor
In order to be considered eligible to sit for the examination for Certificate of Competency as a Gas Engineering Supervisor, a person shall satisfy the Panel that he complies with the following conditions:
that he holds a degree or diploma in gas, mechanical, civil, chemical, petroleum, fuel, electrical, mining, industrial or production engineering from a recognised university or institution
44
or any engineering degree or diploma recognised by the Commission;
that he has not less than two years working experience in gas pipeline or gas installation work;
Before a Certificate of Competency as a Gas Engineering Supervisor is issued to a person, he shall satisfy the Panel that —
he has sufficient knowledge of gas engineering practices, including the principles of operation of the equipment used for production, transmission, distribution, utilisation, metering and maintenance of a gas pipeline or gas installation; and
The examination for a Certificate of Competency as a Gas Engineering
Supervisor shall be based on a syllabus to be determined by the Panel and shall be partly by written answers to questions set and partly by viva voce.
The examination for Certificate of Competency as a Gas Engineering
Supervisor referred to in subregulation (3) shall be conducted by the Panel.
Notwithstanding subregulation (1) or (3), the Panel may, in its discretion, exempt a person from any or all of the requirements necessary for the examination.
Certificate of Competency as a Gas Fitter
Eligibility to become a Gas Fitter
In order to be considered eligible to sit for the examination for a Certificate of Competency as a Class III Gas Fitter, a person shall satisfy the Panel that he complies with the following conditions:
that he has one year working experience in gas pipeline or gas installation work with a Gas Contractor or in a recognised academic institution or Government Department or agency;
A person applying to sit for the examination as a Class II Gas Fitter shall fulfill the following conditions:
he is a holder of a Certificate of Competency as a Class III Gas Fitter or any equivalent Certificate of Competency; and
he has the working experience as an assistant to a Gas Engineer,
Gas Engineering Supervisor or Class I or II Gas Fitter by maintaining, operating or controlling a gas pipeline or gas installation for a period of two years whilst holding a Certificate referred to in paragraph (a).
A person applying to sit for the examination as a Class I Gas Fitter shall fulfill the following conditions:
he is a holder of a Certificate of Competency as a Class II Gas Fitter or any equivalent Certificate of Competency; and
he has the working experience as an assistant to a Gas Engineer,
Gas Engineering Supervisor or Class I or II Gas Fitter by maintaining, operating or controlling a gas pipeline or gas installation for a period of one year whilst holding a Certificate referred to in paragraph (a).
Before a Certificate of Competency as a Gas Fitter of any class is issued to a person, he shall satisfy the Panel —
that he has sufficient knowledge and practical skill in gas pipeline or gas installation work; and
that he has sufficient knowledge of the Enactment and the regulations made thereunder.
The examination for a Certificate of Competency as a Gas Fitter shall be based on a syllabus to be determined by the Panel and shall be partly by written answers
46
to questions set and partly by viva voce and may include any practical test as the
Panel deems necessary.
Notwithstanding subregulation (1) or (5), the Panel may, in its discretion, exempt a person from any or all of the requirements necessary for the examination.
Issuance, restriction or endorsement of Certificate of Competency by Panel
The Panel may in its discretion —
issue a Certificate of Competency as a Gas Fitter to a person who has passed the examination under regulation 96;
restrict the use of a Certificate of Competency to a type, class, duration or location of installation;
endorse a Certificate of Competency to permit the holder to test and certify a gas installation on the condition that he has shown sufficient knowledge and experience in carrying out such work to the satisfaction of the Panel;
impose any other endorsement on a Certificate of Competency issued under these Regulations as the Panel deems necessary; and
impose a fee payable for the removal of any restriction or endorsement on a Certificate of Competency as prescribed in Part II of the Third Schedule.
Temporary registration of foreign person
Subject to these Regulations and the conditions as the Panel may think fit to impose, the Panel may, upon payment of the fee prescribed in Part II of the Third
Schedule, issue a temporary Certificate of Competency to a foreign person.
A foreign person may be considered for the issuance of the temporary Certificate of Competency if he satisfies the Panel —
that he possesses the necessary qualification and skill which is recognised for the practice of gas engineering in the country where he normally practises;
that he possesses the necessary expertise and his physical presence is required in Malaysia; and
47
Notwithstanding subregulation (2), before a person may be considered for the purpose of temporary registration as a Gas Engineer, he shall be registered temporarily as a Professional Engineer with the Board of Engineers under the
Registration of Engineers Act 1967.
The Commission may issue a temporary Certificate of Competency for a period not exceeding twelve months.
A foreign person whose Certificate of Competency has expired may apply for renewal subject to the provisions of these Regulations and the Commission may renew the Certificate as he deems fit.
For the purpose of these Regulations, “foreign person” means a person who is not a citizen or a permanent resident of Malaysia.
Endorsement of equivalent Certificate of Competency by Panel
The Panel may, in its discretion, exempt from the whole or part of the examination, any candidate who is a resident of Malaysia and who is the holder of a Certificate of Competency which, in the opinion of the Panel, is equivalent to the corresponding Certificate issued under these Regulations.
The person under subregulation (1) may be recommended to be issued an appropriate Certificate of Competency upon payment of the fee as prescribed in
Part II of the Third Schedule.
The Panel may, in its discretion, exempt a candidate who is a resident of Malaysia from an examination for a Gas Engineer’s Certificate of Competency if —
he is a holder of a Certificate of Competency which, in the opinion of the
Panel, is equivalent to the relevant Certificate issued under these
Regulations; and
The Commission shall, on payment of the prescribed fee, grant the relevant
Certificate of Competency to a candidate exempted from the examination under subregulation (2).
48
Registration of Gas Contractor
Gas Contractor
No person shall perform or carry out any work in respect of installing, constructing, testing, commissioning, calibrating, maintaining, repairing or operating a gas pipeline or gas installation or part of it unless he holds a valid Certificate of
Registration as a Gas Contractor issued under these Regulations.
The Certificate of Registration as a Gas Contractor shall be as prescribed in
Form H of the First Schedule and shall be valid for twelve months from the date of issue or its renewal.
Classification of Gas Contractor and scope of work
A Gas Contractor registered under these Regulations shall be classified into the following classes —
The scope of work of the various classes of Gas Contractors is as prescribed in Table 3 of the Second Schedule.
Class A Gas Contractor
A Class A Gas Contractor shall have under his employment at least a Gas
Engineer or a Gas Engineering Supervisor and a Class I Gas Fitter who are employed on a full time basis by the Gas Contractor.
A Class A Gas Contractor may undertake to design, install, modify, test, commission and maintain the classes of gas installations as prescribed in Table 3
of the Second Schedule.
49
Any work done by a Class A Gas Contractor shall be in accordance with the competency of the competent person employed.
The scope of work of the competent person employed by a Class A Gas
Contractor is as prescribed in Table 2 of the Second Schedule.
Class B Gas Contractor
A Class B Gas Contractor shall have under his employment at least a
Class I Gas Fitter who is employed on a full time basis by the Gas Contractor.
A Class B Gas Contractor may undertake to design, install, modify, test, commission and maintain the classes of gas installations as prescribed in Table 3
of the Second Schedule.
Any work done by a Class B Gas Contractor shall be in accordance with the competency of the competent person employed.
The scope of work of the competent person employed by a Class B Gas
Contractor is as prescribed in Table 2 of the Second Schedule.
Class C Gas Contractor
A Class C Gas Contractor shall have under his employment at least a
Class II Gas Fitter who is employed on a full time basis by the Gas Contractor.
A Class C Gas Contractor may undertake to design, install, modify, test, commission and maintain the classes of gas installations as prescribed in Table 3
of the Second Schedule.
Any work done by a Class C Gas Contractor shall be in accordance with the competency of the competent person employed.
The scope of work of the competent person employed by a Class C Gas
Contractor is as prescribed in Table 2 of the Second Schedule.
50
Class D Gas Contractor
Class D Gas Contractor shall have under his employment at least a
Class III Gas Fitter who is employed on a full time basis by the Gas Contractor.
A Class D Gas Contractor may maintain and repair a Class III gas installation as prescribed in Table 3 of the Second Schedule.
Any work done by a Class D Gas Contractor shall be in accordance with the competency of the competent person employed.
The scope of work of the competent person employed by a Class D
Gas Contractor is as prescribed in Table 2 of the Second Schedule.
Requirements for registration as a Gas Contractor
No Certificate of Registration as a Gas Contractor shall be issued or renewed unless the Commission is satisfied that —
the person has registered his business with the Registrar of Business or Registrar of Companies, as the case may be;
the person employs, on a full time basis, competent person as specified under subregulations 102(1), 103(1), 104(1) and 105(1) as prescribed in Table 4 of the Second Schedule;
the person has an insurance coverage for his employees under the
Employees Social Security Act 1969; and
the person is in possession of suitable equipment, testing equipment and instruments related to his work as determined by the Commission.
Information required for registration as a Gas Contractor
Before issuing or renewing a Certificate of Registration as a Gas Contractor, the Commission shall require the person to submit the following information —
the names and addresses of all partners in the case of registered partnership, and of all directors, managers and shareholders in the case of registered company;
51
Fees for Certificate of Registration as a Gas Contractor
A fee shall be paid for a Certificate of Registration as a Gas Contractor and its renewal at the rate as prescribed in Part II of the Third Schedule.
Renewal of Certificate of Registration
The renewal of a Certificate of Registration as a Gas Contractor shall be made in not less than two months before the date of expiry of the Certificate.
Transfer of Certificate of Registration
No Certificate of Registration shall be transferred by the holder of the
Certificate unless with the written permission of the Commission.
The holder of a Certificate of Registration shall obtain approval from the
Commission in writing of any change of name or address in connection with the business and the Certificate shall be amended or replaced accordingly free of charge.
Cancellation of Certificate of Registration
The Commission may cancel a Certificate of Registration of a Gas
Contractor if —
the holder of the Certificate ceases to carry on the business in respect of which he is registered;
the holder of the Certificate or his servant or agent contravenes or fails to comply with the Enactment or these Regulations.
Where a Certificate of Registration is cancelled by the Commission pursuant to subregulation (1), the Certificate shall be returned to the Commission by the
52
person to whom the Certificate is issued within fourteen days of the notification in writing of the cancellation.
Replacement of Certificate of Registration of Gas Contractor
If a Certificate of Registration of a Gas Contractor issued by the
Commission is lost, stolen, destroyed, mutilated, or defaced, a replacement of the Certificate may be issued by the Commission on production of a statutory declaration by the holder that the original Certificate has been lost, stolen or destroyed or upon surrender of the mutilated or defaced original Certificate.
The fee for the replacement certificate issued under subregulation (1) is as prescribed in Part II of the Third Schedule.
Removal and reinstatement of Gas Contractor
The name and other particulars of a person who is registered as a Gas
Contractor shall be removed from the Register if —
may appeal within thirty days of the removal from the Register for reinstatement and the Commission may, upon receipt of satisfactory evidence or reasons for his reinstatement, register him again.
A person who feels aggrieved by the decision of the Commission not to reinstate him, may apply to the Minister for reconsideration of the matter.
The application under subregulation (3) shall be made in writing within twenty one days from the date of the decision of the Commission against reinstatement and shall contain the grounds of grievance.
Upon reinstatement, a fee as prescribed in Part II of the Third Schedule shall be paid by the person referred to in subregulation (2) and the registration shall be valid for twelve months from the date of expiry of the registration.
53
Gas Fittings, Gas Appliances and Gas Equipment
Certificate of Approval for assembler, manufacturer or importer of gas fittings, gas appliances and gas equipment
No person shall assemble or manufacture, or import a gas fitting, gas appliance or gas equipment without getting the approval of the Commission.
A Certificate of Approval to assemble or to manufacture, or import a gas fitting, gas appliance or gas equipment shall be as prescribed in Forms I and J of the First Schedule respectively.
The Certificate of Approval under subregulation (2) shall be valid for a period of twelve months from the date stated in the Certificate and may be renewed not later than two months before the date of its expiry.
Test and certification of gas fittings, gas appliances or gas equipment before assembly, etc.
No gas fitting, gas appliance or gas equipment shall be assembled, manufactured, imported, sold or used unless it has been tested and certified and approved by the Government or its agent or a person accredited by the Government.
A Certificate of Approval for a gas fitting, gas appliance or gas equipment shall be as prescribed in Form K of the First Schedule.
The Certificate of Approval under subregulation (2) shall be valid for a period of twelve months from the date stated in the Certificate and may be renewed not later than two months before the date of its expiry.
Fee for Certificate of Approval
A fee shall be paid for the issuance and renewal of a Certificate of
Approval referred to in subregulations 114(2) and 115(2) at the rate as prescribed in Part II of the Third Schedule.
If a Certificate of Approval issued by the Commission is lost, stolen, destroyed, mutilated, or defaced, a replacement of the Certificate may be issued
54
by the Commission on production of a statutory declaration by the holder that the original Certificate has been lost, stolen or destroyed or upon surrender of the mutilated of defaced original Certificate.
The fee for the replacement certificate issued under subregulation (2) is as prescribed in Part II of the Third Schedule.
Marking or labeling of approved gas fittings, gas appliances or gas equipment
Where a gas fitting, gas appliance or gas equipment has been approved for use or sale by the Commission, the person to whom a Certificate of Approval has been issued under subregulation 115(2) shall mark the gas fitting, gas appliance or gas equipment in the manner to be determined by the Commission.
Where the Commission is of the opinion that a gas fitting, gas appliance or gas equipment approved under these Regulations cannot be marked in the manner as in subregulation (1) due to the nature of the gas fitting, gas appliance or gas equipment, the Commission may allow the marking to be made on a container or a label affixed to a bundle in which the gas fitting, gas appliance or gas equipment is contained or in any other manner to be determined by the Commission.
Samples of gas fittings, gas appliances or gas equipment to be delivered to the Commission
An application for a Certificate of Approval of a gas fitting or gas appliance or gas equipment under subregulation 115(2) shall be made to the
Commission in a manner as may be determined by the Commission.
The applicant shall deliver to the Commission a sample of the gas fitting, gas appliance or gas equipment under subregulation (1) and other information in connection with it, including drawings, photographs, pamphlets and technical literature, as the Commission may require.
A sample delivered shall be attached or affixed with a label containing the following particulars:
the catalogue or type number of the manufacturer, or any other means of distinguishing the sample.
The Commission shall not be liable for loss or damage caused to a sample delivered under subregulation (2).
Examination and test of sample
The Commission may cause one or more samples under regulation 118
to be examined and tested before granting a Certificate of Approval under subregulation 115(2).
Where the Commission considers that the sample examined and tested under subregulation (1) is likely to cause danger, the person applying for the Certificate of Approval shall modify or alter the sample to comply with the requirements of the
Commission and submit the modified or altered sample.
Test, seizure and removal of dangerous gas fitting, gas appliance or gas equipment
The Commission may at any time by notice in writing require a person who assembles, manufactures, imports or sells a gas fitting, gas appliance or gas equipment to deliver, within the time specified in the notice, a sample of the gas fitting, gas appliance or gas equipment for examination and test.
If a gas fitting, gas appliance or gas equipment is, in the opinion of the
Commission, unsafe or dangerous for use, or likely to become unsafe or dangerous for use, the Commission may prohibit the use or sale of the gas fitting, gas appliance or gas equipment and, where necessary, may seize and remove the gas fitting, gas appliance or gas equipment.
The Commission shall not be liable for any loss or damage caused to a gas fitting, gas appliance or gas equipment delivered, seized and removed under subregulations (1) and (2).
56
Gas appliance safety precautions
No person shall install a gas appliance unless —
the gas fitting and the gas equipment to be used in connection with the gas appliance are in the condition which ensures that the gas appliance can be used without causing danger to a person or property;
the general conditions of installation including the stability of the gas appliance and its connection to any other gas fitting are such that the appliance can be used without causing danger to a person or property;
Notwithstanding subregulation (1), the person shall also ensure that —
there is sufficient permanent supply of air for the gas appliance for proper combustion;
there is sufficient ventilation to the room or the internal space in which the gas appliance is to be used; and
Access to gas appliances
No person shall install a gas appliance except in such a manner that it is easily accessible for operation, inspection and maintenance.
Testing of gas appliances
If a person installs a gas appliance at a time when gas is being supplied to the premises in which the gas appliance is to be installed, he shall
57
immediately after that, test the connection to the gas appliance to verify that the connection is gas tight and examine the gas fitting, gas equipment, other works for the supply of gas and flue or means of ventilation to be used in connection with the gas appliance for the purpose of ascertaining whether —
the gas appliance has been installed in compliance with the manufacturer’s instructions relating to the use of the gas appliance;
and
If a person carrying out a test or an examination in relation to a gas appliance determines that adjustments are necessary to ensure compliance with the requirements specified in subregulation (1), he shall either carry out those adjustments or disconnect the supply of gas to the gas appliance.
No person shall install a gas appliance in a premises without testing the connection to the gas appliance for gas tightness.
No person shall install a gas appliance without first ascertaining that all the gas safety controls are in proper working order.
Unsafe gas appliances
No person shall use a gas appliance or permit a gas appliance to be used if he knows or has reason to suspect that —
there is insufficient supply of air available for the gas appliance for proper combustion at the point of combustion;
the removal of the products of combustion from the gas appliance is not being or cannot be safely carried out;
the room or internal space in which the gas appliance is situated is not adequately ventilated for the purpose of providing air containing sufficient oxygen for the person present in the room or in the internal space, or in the vicinity of the internal space while the gas appliance is in use;
58
gas is escaping from the gas fitting or gas equipment used in connection with the gas appliance; or
the gas appliance or any part of it, the gas fitting or gas equipment connected to it cannot be used safely.
Irreparable gas appliance
A person who finds a gas appliance beyond repair or in an unsafe condition shall discontinue using the gas appliance and shall immediately notify an authorized officer of its conditions and location.
If the notification under subregulation (1) is made verbally, the person shall immediately after that reduce it to writing and shall state all the relevant facts.
Maintenance of gas installation
A gas installation shall be maintained in good and efficient working order to ensure safety of persons and safety shall be observed at all times so as to prevent danger from arising.
The duty to ensure the safety standards required under subregulation (1)
shall be on the responsible person.
A domestic gas installation shall be checked, tested and certified by the appropriate competent person every three years but other gas installations shall be similarly inspected, tested and certified every two years.
Notwithstanding subregulation (3), the Commission may direct the inspection, test and certification of any gas installation to be carried out at any time.
59
Power of the Commission to inspect
The Commission shall inspect a gas installation or premises where a gas installation is located if he thinks that it is necessary to do so in the interest of public or private safety.
The Commission shall require an inspection to be made by sending a notice in writing to the responsible person and that person shall attend the inspection and give any assistance as may be required by the Commission in the notice.
Competent person to undertake maintenance work
No person other than a competent person or a person acting under the immediate supervision of a competent person, shall undertake to carry out the repair and maintenance of a gas pipeline or gas installation.
The scope of maintenance for a competent person is as prescribed in Table 2
of the Second Schedule.
Record of maintenance
There shall be kept a maintenance record book in which any maintenance and repair work carried out on a gas installation is recorded.
Authorized or qualified person to do certain work
No person, other than an authorized person of a licensee, a competent person having the permission of a private gas licensee, or a competent person having the permission of the owner or occupier shall —
No person shall do welding on a metallic gas piping unless that person is a holder of a valid certificate of qualification from the relevant authority.
No person shall install or inter-connect non-metallic pipe unless that person is the holder of a valid certificate of qualification from the relevant authority.
The Commission may determine the qualification that a person shall have in order to weld piping, install or inter-connect other equipment composed of plastic, metal, glass or other material.
Testing after disconnection
Where a competent person or a person under the supervision of a competent person disconnects the outlets of a meter from house piping, he shall
—
turn the meter on again only after testing the house piping and ensuring that no other outlets are open.
Competent person to notify of need to repair
Where a competent person has reason to believe that there is a need for the alteration of, or the repair of a part of a supply system, the competent person shall immediately notify the responsible person of the matter.
Competent person may make emergency repair
Where gas is leaking from a part of the gas supply system, a competent person may make necessary emergency repairs and shall notify the responsible person of the permanent repairs that are necessary.
Replacement of meter
A meter shall be replaced every ten years or at any time when the meter malfunctions.
61
Safety and precaution during maintenance work
When a person is carrying out maintenance work within the vicinity, he shall take adequate precautions to prevent a gas installation or gas equipment from being accidentally or inadvertently made unsafe.
A person engaged in maintenance work in connection with a gas installation or equipment shall be adequately protected from danger and the responsibility for such protection shall be on the responsible person, his servant or agent, as the case may be.
Authority card
For the purpose of subsection 45(1) of the Enactment, the authority card to be carried by the authorized officers is as prescribed in Form L of the First
Schedule.
Fees to be paid in advance
All fees payable to the Commission under the Enactment and these
Regulations shall be paid in advance and shall not be refundable unless there is ample justification for a refund.
Serious accident to be reported and investigated
For the purpose of section 68 of the Enactment, the authorized officer or other officer shall, as soon as practicable, upon being notified of an accident or a fire —
direct that the person or authority provides him with photographs, medical reports or other relevant documents on the accident or fire;
if there has been a loss of life or there is a reason to believe that a person has been fatally injured, send a copy of his findings to the nearest police station.
In the event of the loss of life or grievous hurt is suffered by a person due to an accident or a fire in connection with a gas pipeline or gas installation, no alteration or addition shall be made to the gas pipeline or gas installation or any part of it which may have contributed to the accident or fire without the consent of the Commission and until the Commission or the authorized officer has completed his investigation:
Provided that this subregulation shall not operate to interfere with the rescue work or work necessary for the general safety of life or property.
If upon a preliminary investigation under subregulation (2) it appears to the authorized officer or other officer making the investigation that there is a reason to believe that —
the accident or fire was due to failure to comply with the Enactment or these Regulations or an order duly made by the Commission; or
the accident or fire could have been prevented if proper precautions had been taken in carrying out work on a gas pipeline or gas installation or any part of it, the Commission or authorized officer may further investigate the circumstances of the accident or fire.
If the Commission is of the opinion that any offence under the Enactment or these Regulations has been committed, the Commission shall immediately forward to the police a copy of the report of the authorized officer’s report referred to in subregulation (2) together with his opinion on the circumstances and findings.
A person involved in the investigation made under this regulation may be entitled to receive a copy of the summary of the evidence and the decision made upon payment of a fee of fifty ringgit.
63
The Commission to keep records
The Commission shall keep the following records which have to be numbered according to chronological order —
all inquiries held under the Enactment and the evidence taken in respect of the inquiries;
all accidents and fires involving any gas pipeline or gas installation investigated;
all registered importers, assemblers and manufacturers of gas fitting, gas appliances and gas equipment;
Offence
Any person who contravenes these Regulations shall be guilty of an offence.
64
[Subregulation 5(2)]
FORM A
GAS LICENCE
Licence No.:
In accordance with section 5 of the Gas Supply Enactment 2023, this licence is issued to .......................................................................................... ..........................
(Name of Licensee)
of ..............……........................................................................................................
(Address of Licensee)
…………………………………………………………………………………….…………
for the……………………………....…….., in accordance with the Gas Supply
Regulation 2023, a gas installation at …...................................................................
(Location of installation)
in the State of Sabah.
This licence is subject to the following requirements:
Class of installation: ...................... (b) Capacity of gas supplied:
..............................................
..................................MMBTU
Duration of licence (from): .....................
(to)..……………………
Date of issue: …………………...
Place of Issue: .........................................
Fee: RM …………………………
Note:
……….…………………………................…..
Commission
Renewal of the licence shall be made in not less than two months before the date of expiry of licence.
65
[Regulation 14]
FORM B
CERTIFICATE OF COMPLETION
Name and address of owner:.....................................……………………….
Location of installation:......................................................………………….
Application reference No.:……….
Date of application:.........………..
Contractor:
Competent Person:
Name:.……….…………………...
Registration No.: ……………..
I hereby certify that the above installation has been installed and completed on …………………… 20...................... in accordance with the provision of the Gas
Supply Enactment 2023 and the Gas Supply Regulations 2023.
Signed by:
Witnessed by:
.......................................................…
……………............................................
(Name: ............... ………………….)
(Name ...................................................... )
Stamp and Signature of
Stamp and Signature
Competent Person of Owner/Representative
Date:………………………..
Date:....................................................
66
[Subregulation 15(2)]
FORM C
TEST CERTIFICATE
Name and address of owner:........................................................................................
................................................................................................................……………….
Location of installation:.................................................................................................
Application reference No.:…….……
Date of application:.........……........……..
Contractor:
Competent Person:
Name:.……….…………………...
Holiday Test:
Leak Test:
Date: …………………….......……
Please attach detail and result of test of test
Remarks:. ………………………..…
Remarks:………………...…...……
I hereby certify that the above installation have been tested on ................ 20 ...... in accordance with the provision of the Gas Supply Enactment 2023 and the Gas
Supply Regulations 2023.
Signed by:
Witnessed by:
.................................................................
................................................................
(Name:............…………........................)
(Name ................................................... )
Stamp and Signature of Competent Person Stamp and Signature of Owner/
Representative
Date: ...........…………………………….
Date: .......................................................
67
[Subregulation 16(2)]
FORM D
NOTICE OF WORK ON A GAS INSTALLATION
Name and address of licensee :..................................................................................
.................................................................................................................................…..
Licence No.: .....................................
Location of installation:.............................
Type of work to be done:.............................................................................................
Contractor:
Competent Person:
Name:.……….………………….....
Registration No.: ……………..
I hereby notify that in accordance with the Gas Supply Enactment 2023 and regulation 16 of the Gas Supply Regulations 2023 the above work will be carried out at the above gas installation.
Date: …………………………
.………………………………......……
(Stamp and Signature of Licensee)
Note:
In the case of any installation or alteration is to be carried out on an existing gas installation, the competent person shall submit a working procedure to the
Commission.
68
[Subregulation 20(1)]
FORM E
NOTICE OF INSPECTION AND TEST OF LEAKAGE OF GAS
To: ................................................................................................................................
(Name of owner)
of..............................................................................………………………………
(Address of owner)
............ ……………………………………………………………………………
I hereby notify that in accordance with regulation 20 of the Gas Supply Regulations 2023, an inspection and leak test will be made on the ……………… 20................
at.................... a.m./p.m. and the responsible person of the gas installation is required to be present during the inspection and test and shall give any assistance as may be required.
Date: ..........................................
...............................…………………..
Commission
69
[Subregulations 80(1) and 89(2)]
FORM F
CERTIFICATE OF COMPETENCY AS
GAS ENGINEER/GAS ENGINEERING SUPERVISOR
Name:
Holder’s Identity Card No.:
Holder’s Date of Birth:
has been examined and found to possess the qualifications prescribed by the Gas Supply
Regulations 2023. This Certificate of Competency as a GAS ENGINEER/ GAS
ENGINEERING SUPERVISOR is issued to him/ her and shall not be used by any other person.
RESTRICTION, IF ANY: * (a) GAS ENGINEER
Others:
Place of issue
: ............................................................
Date of issue
: ............................................................
Fee
Note:
................................................
Holder’s Signature
Commission or thumbprint
If this Certificate comes into the possession of any person other than the person to whom it was issued, it shall be returned immediately to the Commission.
* Delete whichever is not applicable.
70
[Subregulations 80(1) and 89(2)]
FORM G
CERTIFICATE OF COMPETENCY AS GAS FITTER
Name:
Holder’s Identity Card No.:
Holder’s Date of Birth:
has been examined and found to possess the qualifications prescribed by the Gas Supply
Regulations 2023. This Certificate of Competency as a GAS FITTER is issued to him/her and shall not be used by any other person.
RESTRICTION, IF ANY: * (a) CLASS I
Others:
Place of issue
: ............................................................
Date of issue
: ............................................................
Fee
Note:
……………………………………….
Holder's Signature
Commission or thumbprint
If this Certificate comes into the possession of any person other than the person to whom it was issued, it shall be returned immediately to the Commission.
* Delete whichever is not applicable.
71
[Subregulation 100(2)]
FORM H
CERTIFICATE OF REGISTRATION OF GAS CONTRACTOR
In accordance with subregulation 100(2) of the Gas Supply Regulations 2023, this Certificate is issued to ..........................................................................................................................................................
..............................................................................................................................................................
..............................................................................................................................................................
(Name, I/C No. and Address of Holder)
on behalf of ............................................................................................................................
(Name of Business)
and authorises the holder to carry out the business as a Gas Contractor of CLASS A/CLASS B/CLASS
C/CLASS D* at ......................................................................................................................................
................................................................................................................................................................
(Address of business and branches)
for a period of twelve months from date of issue or renewal shown below:
Place of issue/renewal*
: ............................................................
Date of issue/renewal*
: ............................................................
Registration No.
: ............................................................
Fee
Note:
….………………………………………….
Holder's Signature
Commission or thumbprint
Renewal of registration shall be made in not less than two months before the date of expiry of registration.
If this Certificate comes into the possession of any person other than the person to whom it was issued, it shall be returned immediately to the Commission.
* Delete whichever is not applicable.
72
[Subregulation 114(2)]
FORM I
CERTIFICATE OF APPROVAL TO MANUFACTURE/
ASSEMBLE GAS FITTING/APPLIANCE/EQUIPMENT
In accordance with subregulation 114(2) of the Gas Supply Regulations 2023, this Certificate is issued to ............................................................................................................................................................
................................................................................................................................................................
................................................................................................................................................................
(Name, I/C No. and Address of Holder)
on behalf of ............................................................................................................................................
(Name of manufacturer/assembler)
and authorises the holder to manufacture/assemble* gas fitting/gas appliance/gas equipment* at........
.................................................................................................................................................................
(Address of business)
for a period of twelve months from date of issue or renewal shown below:
Place of issue/renewal*
: ............................................................
Date of issue/renewal*
: ............................................................
Approval No.
: ............................................................
Fee
….………………………………………….
Holder's Signature
Commission or thumbprint
Note:
Renewal shall be made in not less than two months before the date of expiry of the Certificate.
If this Certificate comes into the possession of any person other than the person to whom it was issued, it shall be returned immediately to the Commission.
* Delete whichever is not applicable.
73
[Subregulation 114(2)]
FORM J
CERTIFICATE OF APPROVAL TO IMPORT
GAS FITTING/GAS APPLIANCE/GAS EQUIPMENT
In accordance with subregulation 114(2) of the Gas Supply Regulations 2023, this Certificate is issued to ............................................................................................................................................................
................................................................................................................................................................
................................................................................................................................................................
(Name, I/C No. and Address of Holder)
on behalf of ............................................................................................................................................
(Name of importer)
and authorises the holder to import gas fitting/gas appliance/gas equipment* .....................................
................................................................................................................................................................
................................................................................................................................................................
(Address of importer)
for a period of twelve months from date of issue or renewal shown below:
Place of issue/renewal*
: ............................................................
Date of issue/renewal*
: ............................................................
Approval No.
: ............................................................
Fee
….………………………………………….
Holder's Signature
Commission or thumbprint
Note:
Renewal shall be made in not less than two months before the date of expiry of the Certificate.
If this Certificate comes into the possession of any person other than the person to whom it was issued, it shall be returned immediately to the Commission.
* Delete whichever is not applicable.
74
[Subregulation 115(2)]
FORM K
CERTIFICATE OF APPROVAL
GAS FITTING/GAS APPLIANCE/GAS EQUIPMENT
In accordance with subregulation 115(2) of the Gas Supply Regulations 2023, I hereby approve the following item for sale and use:
Description of gas fitting/gas appliance/gas equipment*:
Trade Name: ....................................................................
Type/Model: ....................................................................
kW/psi rating: ..................................................................
This approval is issued to ....................................................................................................…
..................................................................................................................................................
...............................................................................................................................................…
….…………………………………………………………………………………………………….
(Name, I/C No. and Address of Holder)
on behalf of .....................................................................................................................…….
(Company)
Place of issue/renewal*
: ............................................................
Date of issue/renewal*
: ............................................................
Approval No.
: ............................................................
Fee
….………………………………………….
Holder's Signature
Commission or thumbprint
Note:
If this Certificate comes into the possession of any person other than the person to whom it was issued, it shall be returned immediately to the Commission.
* Delete whichever is not applicable.
75
[Regulation 136]
FORM L
AUTHORITY CARD OF AUTHORIZED OFFICER
Full Name: ................................................................................
Identity Card No.: .....................................................................
Signature of Holder: ..................................................................
The holder of this card whose name and photograph appears above is an officer duly appointed under section 45 of the Sabah Gas Supply Enactment 2023.
Under section 46 of the said Enactment he may, for the purpose of discharging any of his duties or carrying out any of his functions under the said Enactment or the regulations made thereunder, enter any land, house or building.
A person who finds this card shall surrender the card to the Commission.
Date of Issue: ………………..…….
………………………………….………
Commission
76
[Regulation 10]
CLASSIFICATION OF GAS INSTALLATION
TABLE I
Class of Installation
Criteria of Classification 1.
Class I
Natural Gas
Installation with maximum operating pressure exceeding 60 psig
Liquefied Petroleum Gas
Installation with bulk storage exceeding 10
kl aggregate water capacity;
and pipeline with maximum operating pressure exceeding 20 psig after first stage regulator.
Class II
Natural Gas
Installation with maximum operating pressure exceeding 5 psig but not exceeding 60 psig
Liquefied Petroleum Gas
Installation with aboveground bulk storage not exceeding 10 kl aggregate water capacity;
or
Installation with manifolded cylinders exceeding 2.5 kl aggregate water capacity (vapour withdrawal or liquid withdrawal with vaporizer);
and pipeline with maximum operating pressure exceeding 5 psig but not exceeding 20 psig after first stage regulator.
Class III
Natural Gas
Installation with maximum operating pressure not exceeding 5 psig
Liquefied Petroleum Gas
Installation with manifolded cylinders not exceeding 2.5 kl aggregate water capacity (vapour withdrawal only);
and pipeline with maximum operating pressure not exceeding 5 psig after first stage regulator.
77
[Regulation 14, Subregulations 15(1), 80(3), 102(4), 103(4), 104(4), 105(4) and 128(2)]
TABLE 2
SCOPE OF WORK OF VARIOUS CLASSES OF COMPETENT PERSON
Competent
Person
Endorsement of Plan
Endorsement of Certificate of
Completion
Endorsement of Test
Certificate
Repair of gas installation
Maintenance of gas installation 1.
Gas Engineer All Classes of gas installation
All Classes of gas installation
All Classes of gas installation
All Classes of gas installation
All Classes of gas installation 2.
Gas
Engineering
Supervisor
Class II and
Class III gas installation
All Classes of gas installation
All Classes of gas installation
All Classes of gas installation
All Classes of gas installation 3.
Gas Fitter
Class I
Clas s III gas installation
Class II and
Class III gas installation
Class II and
Class III gas installation
Class II and
Class III gas installation
Class II and
Class III gas installation
Class II
Clas s III gas installation
Clas s III gas installation
Clas s II I gas installation
Class III gas installation
Class III gas installation
Class III
Clas s III gas installation
(repair work only)
Clas s II I gas installation
(repair work only)
Class III gas installation
Class III gas installation
78
[Subregulations 101(2), 102(2), 103(2), 104(2) and 105(2)]
TABLE 3
SCOPE OF WORK OF VARIOUS CLASSES OF GAS CONTRACTORS
Classes of as
Contractor
Design of
Gas
Installation
Installation
Testin g
Commissionin g Maintenance and
Repair 1.
Class A
All Classes of gas installation
All Classes of gas installation
All Classes of gas installation
All Classes of gas installation
All Classes of gas installation 2.
Class B
Class III gas installation
Class
II and Class
III gas installation
Class II and
Class
III gas installation
Class II and
Class III gas installation
Class
II and
Class
III gas installation 3.
Class C
Class III gas installation
Class III gas installation
Class III gas installation
Class III gas installation
Class III gas installation 4.
Class D
—
—
—
—
Class III gas installation
79
[Paragraph 106(b)]
TABLE 4
COMPETENT PERSON REQUIRED FOR CERTAIN CLASSES OF GAS CONTRACTORS
Gas Contractor
Minimum Standard for Competent Person Required 1.
Class A
Gas Engineer or Gas Engineering Supervisor, and
Class III Gas Fitter
80
THIRD SCHEDULE
[Regulation 6, Subregulations 12(5) and 13(3), Regulation 21, Subregulations 85(2) and 86(2), Regulation 91, Paragraph 97(e), Subregulations 98(1) and 99(2), Regulation 108,
Subregulations 112(2), 113(6), 116(1) and 116(3)]
GOVERNMENT OF THE STATE OF
SABAH GAS SUPPLY ENACTMENT 2023
FEE
Fees to carry out activity under section 4 of the Enactment (Regulation 6)
Regasification licence
The fee shall be based on the reserved capacity for the relevant facility.
The fee charged is 3 cent/MMBTU
(MMBTU = Million British Thermal Unit)
Transportation licence
The fee shall be based on the reserved capacity for the relevant facility.
The fee charged is 1.5 cent/MMBTU
Distribution licence
The fee shall be based on the reserved capacity for the relevant facility.
The fee charged is 3 cent/MMBTU
Import into regasification terminal licence
The fee shall be based on the reserved capacity for the relevant facility.
The fee charged is 1.5 cent/MMBTU
Processing of gas
The fee shall be based on the reserved capacity for the relevant facility.
The fee charged is 3 cent/MMBTU
Shipping licence
The fee shall be based on the reserved capacity for the relevant facility. The fee charged is 1 cent/MMBTU
81
Retail licence
The fee shall be based on the class of installation as follows:
RM per year i.
Class I installation 600.00
ii.
Class II installation 400.00
iii.
Class III installation 200.00
Use of gas licence
The fee shall be based on the class of installation as follows:
RM per year i.
Class I installation 300.00
ii.
Class II installation 200.00
iii.
Class III installation 100.00
Fee for approval to install and approval to operate for gas installation (Subregulations 12(5) and 13(3))
00
Fee for inspection and tests of installation (Regulation 21)
Inspection
RM i.
Class I gas installation 300.00
ii. Class II gas installation 200.00
iii. Class III gas installation 100.00
iv. Additional gas installation 100.00
Leak Test
RM i.
Class I gas installation 300.00
ii. Class II gas installation 200.00
iii. Class III gas installation 100.00
82
iv. Additional gas installation 100.00
Fee for replacement of Certificate of Competency (Subregulation 85(2))
Gas Fitter 50.00
Fee for registration and renewal of registration for competent person (Subregulation 86(2))
RM per year
Fee for examinations (Regulation 91)
Fee for removal of a restriction and endorsement of a Certificate of Competency
(Paragraph 97(e))
Fee for temporary Certificate of Competency for a foreign person (Subregulation 98(1))
RM per year
Fee for endorsement of equivalent Certificate of Competency (Subregulation 99(2))
Fee for Certificate of Registration as Gas Contractor (Regulation 108 and
Subregulation 113(6))
Issuance fee
Renewal per year
00 2000.00
00 1000.00
00 700.00
00 300.00
Fee for issuance and renewal of Certificate of Approval to assemble, manufacture or import any gas fitting, gas appliance or gas equipment (Subregulation 116(1))
Issuance fee
Renewal per year
Importer 800.00 400.00
Fee for issuance and renewal of Certificate of Approval for sale or use of any gas fitting, gas equipment or gas appliance (Subregulation 116(1))
84
00 35.00
Issuance fee
Renewal per year
Fee for replacement of certificate other than Certificate of Competency (Subregulations 112(2) and 116(3))
Certificate of Approval
85
[Subregulation 22(2)]
FIGURE 1
CONCRETE MARKER
86
87
[Subregulation 22(2)]
FIGURE 2
WARNING SIGN POST
88
89
90
[Subregulation 22(2)]
FIGURE 3
PIPELINE MARKER FOR TRAFFIC AREA
91
92
93
[Subregulation 59(1)]
FIGURE 4
MARKING ON GAS PIPELINE
Made this 10 January 2023.
DATUK SERI PANGLIMA HAJI HAJIJI BIN HAJI NOOR,
Chief Minister of Sabah.
94